Loading...
HomeMy WebLinkAboutFPL Airport & GC Underground Impr Agreement7. Before FPL can begin its engineering work on the underground electric distribution facilities, the Customer shall provide FPL with the following: a) Paving, grading, and drainage plans showing all surface and sub -surface drainage satisfactory to FPL, b) A construction schedule, c) An estimate of when electric service will be required, and d) Copies of the Customer's final construction plans as well as other construction drawings (plot, site, sewage, electrical, etc.) requested by FPL plats provided by the Customer must be either recorded by the circuit clerk or other recording officer or prepared and certified as meeting the requirements for recording (except approval by the governing body) by a registered land surveyor. 8. Prior to FPL construction pursuant to this agreement, the Customer shall: a) Clear the FPL easement on the Customer's property of tree stumps, all trees, and other obstructions that conflict with construction, including the drainage of all flooded areas. The Customer shall be responsible for clearing, compacting, boulder and large rock removal, stump removal, paving and addressing other special conditions. The easement shall be graded to within six inches of final grade with soil stabilized. b) Provide property line and comer stakes, designated by a licensed surveyor, to establish a reference for locating the underground cable trench route in the easement and additional reference points when required by FPL. Also, the Customer shall provide stakes identifying the location, depth, size and type facility of all non -FPL underground facilities within or near the easement where FPL distribution facilities will be installed. The Customer shall maintain these stakes, and if any of these stakes are lost, destroyed or moved and FPL requires their use, the Customer shall replace the stakes at no cost to FPL, unless the stakes are lost, destroyed or moved by an agent, employee, contractor or subcontractor of FPL, in which case FPL will pay the Customer the cost of replacing the stakes. c) It is further understood and agreed that subsequent relocation or repair of the FPL system, once installed, will be paid by the Customer if said relocation or repair is a result of a change in the grading by the Customer or any of the Customer's contractors or subcontractors from the time the underground facilities were installed; and, that subsequent repair to FPL's system, once installed, will be paid by the Customer if said repair is a result of damage caused by the Customer or any of the Customer's contractors or subcontractors. d) Provide sufficient and timely advance notice L days) as required by FPL, for FPL to install its underground distribution facilities prior to the installation of paving, landscaping, sodding, sprinkler systems, or other surface obstructions. In the absence of sufficient coordination, as determined by FPL, by the Customer, all additional costs for trenching and backfilling shall be paid by the Customer, and none of the costs of restoring paving, landscaping, grass, sprinkler systems and all other surface obstructions to their original condition, should they be installed prior to FPL's facilities, shall be bome by FPL. e) Pay for all additional costs incurred by FPL which may include, but are not limited to, engineering design, administration and relocation expenses, due to changes made subsequent to this agreement on the subdivision or development layout or grade. f) Provide applicable trenching, backfilling, installation of Company provided conduit and other work in accordance with FPL specifications more particularly described on Exhibit B attached hereto. At the discretion of FPL, either correct any discrepancies, within two (2) working days, found in the installation that are inconsistent with the instructions and specifications attached to this agreement or pay the associated cost to correct the installation within thirty (30) days of receiving the associated bill, and in either case, reimburse FPL for costs associated with lost crew time due to such discrepancies. g) Provide a meter enclosure, downpipe and ell which meet all applicable codes and FPL specifications and which will accommodate FPL's service cable size and design. These items must be confirmed with FPL prior to purchase. FPL will not be responsible for costs involved in modifying or replacing items which do not meet the above criteria. 9. FPL shall: a) Provide the Customer with a plan showing the location of all FPL underground facilities, point of delivery, and transformer locations and specifications required by FPL and to be adhered to by the Customer. b) Install, own, and maintain the electric distribution facilities up to the designated point of delivery except when otherwise noted. c) Request the Customer to participate in a pre -construction conference with the Customer's contractors, the FPL representatives and other utilities within six (6) weeks of the start of construction. At the pre -construction conference, FPL shall provide the Customer with an estimate of the date when service may be provided. 10. This Agreement is subject to FPL's Electric Tariff, including but not limited to the General Rules and Regulations for Electric Service and the Rules of the Florida Public Service Commission, as they are now written, or as they may be revised, amended or supplemented. 11. This agreement shall inure to the benefit of, and be binding upon, the successors and assigns of the Customer and FPL. The Customer and FPL will coordinate closely in fulfilling obligations in order to avoid delays in providing permanent electric service at the time of the Customer's receipt of a certificate of occupancy. Ac ted: 0� ���0 � 2p ��" For FPL (Date) Accepted: Customer,,JO7"per ir-j��/;� (Date) Witness (Date) yf Witness. ,/�Q,/&C (Date) UCD TARIFF ESTIMATE (UCD Tariff Effective: 8!1202014 Vi1R 01 6322245^1 DATE: 9129/2015 PROJECT: LOCATION:11 Exhibit "A" Exhibtt "B" DESIGNER DENNIS PAGANO ,` It 0 OF UNITS IN OF UNITS CHARGES CRED TS (13.2.12.x) Primary lateral riser (if from overhead tarminalion point), pad mounted transformer and trench with cable4n conduit not to exceed 150 feet for radials and 300 feel for loops. Froth Existing Underground From Overhead TorminationPoint Toradnatlon Point (133.12x.1) Single Phase Radial $892.08 X qty so.0o X << : +,:, qty $ (13.2.12.a.2) Two Phase Radial $1,042.11 X n +, qty 50.00 X qly (13.2.12.a,3) Three Phase Radial-15OKVA $0.00 X qty 50.00 X qly (13.2.12.aA) Three Phase Radial .300 KVA $0.00 X ! qty $0.00 X + qly $ (13.2.12.a.S) Single Phase loop $982.56 X qty $0.00 X " qty S (13.2.12x.6) Two Phase Loop $2,312.62 X qty $738.08 X qty $ (13.2.12.x.7) Throe Phase Loop • 150 KVA $879.37 X qty $0,00 X 1 qty Ms (13.2.12x.7) Three-phase Loop -300 KVA $0.00 X qty $0.00 X city $ (13.Ll2.b) Secondary riser and lateral, excluding handhole or junction box, with connection to Applicant's, service cables no greater than 20 foot from Company riser pole. (13.2.12AO) Small Single Phase 410 TPX or smaller $527.88 X ! par riser $ (13.2.12.b.2) Largo Single Phase larger then 410 TPX $942.73 X per riser i (13.2.12.b.3) Small Throe Phase 410 OPX or smaller $676.9$ Xper riser S (13.LI2.b.4) Large Three Phase Is Mar than 410 QPX $1,421.98 X par riser S 113.2.12.c) Small UG commercial services 160 Amp 120V 1125 Amp 1201240V per SRO 21010A) (13.2.12.c.1.a) 2 wire (120V) service on accessible wood pole $759.19 X per service S (13.2.12.c.1.b) 3 wire (120124OV) service on accessible wood polo $810.90 X ; .i is per service $ (13.2.12.c.2.a) 2 wire (120V) service on Inaccessible wood pole $871.64 X 77=ia per service S (13.2,12.c.2.b) 3 vitro (1201240V) service on inaccessible wood polo $923.93 X , : + ' • . r! par servics $ (13.2.12.8.3x) 2 wire (120V) service on scoossibla concrete polo $769.31 X+ .: ' per sorvlee; (13.2.12.c.3.b) 3 wire (120124t1V) service on acc&astble concrete polo $831.74 X , ' • per service (13.2.12.d) Handholes and Padmounted Secondary Junction Boxes, excluding connections. (13.2.12.d.1) Handholos (13.2.12.d.t.a) Steal) 24" handhole 5210.12 X par HH 5 (13.2.12.d.1b) Intermediate 30" handhole $247.85 X ' i ,, •:: per HH (13.2.12AI.c) Large 48"handholo $859.22 X :. i. ; per HH 5 (13.111d.2) Pad Mounted Junction Box (PM TX Dummy $2,991.82 X par box S Cabinet M&S 0781.40000.7) (13.2.12.d.3a) Pad Mounted Junction Cabinet (22 port $11,082.91 X .,, ,, •r+•, <! .! per cabineC S 3 phase cabinet M&S 0191.40100.3) (13.2.12.d.3.b) Tapping conductors (If more than 12 sets) S72,04 X i !a per set $ (13.2.12.&) Primary Splice Box Including splices and cable puliingset-up (13.2.12.o.1) Single Phase par box (13.2.12.e.2) Two Phase per box $1,387.93 $1.895.65 X par box X per box $ - $ - (13.2.12.e.3) Throe Phase par box $1.937.99 X par box I S 3.6 (13.2.12.0) Additional Installation charge for underground primary laterals Including trench and cabledn conduhwwch exceeds the limits set In 13.2.12.a to reach FPL designated point of delivery. (13.2.12.1.1) Single Phase per toot (13.2.12.1.2) Two Phase per toot .28 $3 53.82 X par ft. per ft.(13.212.f.3) Xqper Three Phase par foot $3.06 X 425' ft. S 11300. (13.2.12.g) Additional Installation charge for underground primary laterals Including trench and cablo-In•condull extended beyond the FPL designated point of delivery. (I 3.2.12.g.1) Single Phase par foot 58.49 X per ft. $ (13.2.12.g.2) Two Phase per fool $12.87 X 1 7,,i por ft, 5 (I 3.2.12.g.3) Throe Phase par foot $14.19 X par ft. S (13.2.12.h) UG Feeder (13.2.12.h)1000 KCMIL (not Including switch package) (13.2.12.h) Switch package (819 or 913 perpackaga) WAS $25.838.56 X V per ft. Xeach $ S (13.2.12.h) Switch package (414 per package) $25.838.56 X each $ (13.2.13.x) Trench and backfilling credits (13.2A3x.1) Credit par foot of primary trench 3,14 X . 1145 , ; por ft. IS 3,595.30 (13.2.13.a.2) Credit per foot of secondary trench 52.40 X per(L $ (13.I.13.b) Conduit Installation credits (13.2.13.b.1) Credit par toot of 2" PVC $0.54 X per fl S 1811:70- (13,2.13.b.2) Credit per toot of >2" PVC $0.78 X par It (I &LI3,c) Handhote f primary splice box Installation credits (13.2.13.c.1) Credit par large HH (grouter than 30")1 Pd Splice Box $210.28 X HH{s) S 420.5 (13.2.13.8.2) Credit per small I Intermediate HH (30" or less) $65.28 X HH(s) 113.2.13.d) Transformer! cap bank pad Installation credits (13.2.13.d.) Credit per pad $54.20 X 1' pad(s) 14 54.201 Feeder Splice Box Credit $602.65 XOeach - Padmount Switch Chamber Credit $510.52 X each Additional Charges (rag. non -rapid trenching, restoration. etc.) 73 TOTAL CONTRIBUTION: IS 5178.48 LESS TOTAL CREDITS: I5,178.48 TOTAL CASH PAYMENT: TOTAL CUSTOMER PAYMENT LE5176.48 (CONTRIBUTION MAT + LABOR) P 1 5178 48 (CONTRIBUTION CASH) snara01s V23 AM