Loading...
HomeMy WebLinkAboutCSA-1=a SEBASTIAN HOME OF FEU15!. D CERTIFICATE OF PROJECT COMPLETION Date Accepted: 10/23/18 Project Name & #: Airport Master Plan Update # At 656 Total Project Expenditures: $ 291,800.00 Project Location: Airport Contractor(s): TKDA / American Infrastructure Development 05A -f Contract Amount(s): $ 290,000.00 / $ 1,800.00 Pursuant to the above captioned contract and in compliance of same, we the undersigned do hereby certify that this project is complete. Issuance of this certificate releases the contractor from any further responsibility as stipulated in the contract as it relates to bond performance, payment of subcontractors, release of liens, maintenance and indemnity. All contractual obligations as to warranty, insurance, indemnification and patents, shall remain in full effect for the contractually stipulated period of time. In no way does the issuing of this certificate release the Contractor from all legal obligations as stipulated in Chapter 713 of the Florida Statutes. Therefore, having reviewed the contract and inspected the work, the undersigned to hereby accept the segment as being complete. —s 4/2z/zofy Project Manager Date NIA Building Official (if applicable) Date city `�tfite& IAJt,Q-P,�.&Md, 4 -z3 -l9 Date SEBAST" MUNICIPAL AIRPORT WORK AUTHORIZATION FORM Work Authorization #01 — Sebastian Municipal Airport Airport Master Plan Update (Full) and Airport Layout Plan City Project # A1656 FDOT 439715-1-94-01 FAA 3-12-0145-012-2016 The City of Sebastian hereby assigns to TKDA, a SMA commissioned consultant, approval to conduct those studies associated with updating the Airport Master Plan (Full) and Airport Layout Plan at the Sebastian Municipal Airport as per the attached Scope of Work. Description of Assignment: See Attached Scope of Work Basis of Completion / Period of Services: Services shall be provided for a payment of: $215,000.00 Work will commence upon execution of this Work Authorization by the parties and continue in accordance with Exhibit "A" provided in the Scope of Work. Services shall be completed within 18 -months of the execution of this Work Authorization Form. AGREED as to scope of services, time schedule and budget this 140 day of September, 2016. Authorized under the terms of our Master Agreement dated October 14, 2015. CITY OF SEBASTIAN TL A Florida Municipal Corporation Joseph f3Jriffin, City Manager ta>Fax#m�x t r4Amatio�>RAax�rxirxg Jo n W. Ahern, PE; Vice President, Aviation (seal) Attest: Approved as to Form and Content for Reliance By the City of Sebastian only: ane WIT, MMC, City Clerk Robert A. Ginsburg, City Attorney Administrative Services/CFO: as to budget Exhibit "A" AIRPORT MASTER PLAN UPDATE SCOPE OF SERVICES SEBASTIAN MUNICIPAL AIRPORT Sebastian, Florida PROJECT BACKGROUND: General: The Sebastian Municipal Airport (X26), which is owned and operated by the City of Sebastian, is a busy recreational and experimental business aircraft hub located on the East Coast of Florida between Melbourne International (MLB) and Vero Beach Regional (VRB) Airports. The Airport which includes two paved runways: Runway 5/23, which is 4,023 x 75 feet, and runway 10/28, which is 3,199 x 75 feet, hosts a variety of operations including extensive sky diving operations, experimental and recreational fixed wing operations, aerial patrol and inspection services as well as flight training. Since Runway 5/23 is equipped with RNAV(GPS) approaches and is located within close proximity to VRB, the Airport is heavily used by FlightSafety Academy students sometimes to the detriment of existing tenants. The Airport has recently completed a number of pavement and hangar projects, and is currently completing construction of another corporate hangar facility. Although the Airport is surrounded by residential communities, conservation, as well as limited light commercial properties, the Airport maintains a good relationship with the community which is supportive of the Airport's growth. The Airport is currently home to 38 based aircraft, and hosts on average more than 100 operations per day. Master Plan Update Driving Factors and Key Issues: Several elements support an update to the 2002 master plan including changes to FAA design, funding, sustainability and operational mandates, including FAA Modernization and Reform Act of 2012 new guidelines, Florida Department of Transportation (FDOT) airport operational, environmental, zoning and land use guidance, as well as the City's need to identify and quantify airport development that coincides with planned regional growth including planned road connectivity. As a result, the findings and recommendations outlined in this master plan update will be incorporated into the City's Comprehensive Plan and used as the baseline for any required environmental analyses. The previous Airport vision as illustrated on the 2007 Airport Layout Plan recommended two parallel taxiways to Runway 5/23, a partial parallel taxiway south of Runway 28, pavement removal projects and extensive hangar development. However, since the Airport is surrounded by residential properties and environmentally sensitive lands, the City and Airport Management is interested in cultivating expanded skydiving operations as well as similar recreational activity at the Airport while continuing to support experimental and light aircraft manufacturing operations. Other concerns and opportunities driving the master plan update include the need to: + Designate and protect the Airport Operating Area as well as skydiving landing areas including: Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-1 o Airport safety and security o Surface access o Ground operations, etc. + Evaluate and implement procedures to integrate various operational procedures related to: skydiving activities, experimental aircraft, manned balloons, rotorcraft and other fixed wing operations. + Evaluate potential impacts and recommendations related to integration of new technology (e.g. UAS, light sport, etc.). + Identify and evaluate any potential wildlife threats and determine mitigation options. + Consider requirements to support annual and semi-annual special events and other potential aviation marketing opportunities + Evaluate Airport land use including identifying highest and best use for aviation, semi -aeronautical and non -aviation use for potential revenue diversification. + Re-evaluate and/or update the City's short and long-term vision for Airport development in compliance with City's Comprehensive Plan and federal and state grant assurance, and regulatory requirements including providing the Airport with: o An updated Exhibit 'A' Airport Property Map. And, as part of this update, an Ownership and Encumbrance report (O&E report) is needed to provide a baseline for airport development. o Recommended various safety and security improvements to protect users and visitors. o Recommend changes to airport access and roadway realignments, both on and adjacent to the airport, along with runway protection zone analysis related to Runways 5 and 10. o Identify potential gaps and recommend infrastructure improvements based upon current standards and anticipated demand. o New and updated NEPA environmental compliance (i.e. solid waste recycling, battery recycling, water quality, terrestrial concerns, land use, etc.) and airport sustainability requirements. o Identify and provide recommendations for implementation and monitoring of solid waste, battery recycling and other recycling opportunities compliant with national, state, city and local guidance o New and updated airport design and safety requirements as well as FAA Standard Operating Procedures (SOPs) o Recommended changes related to general aviation airport categories and airport funding requirements o Recommendations for compatible land use and zoning including identifying additional land use opportunities compliant with FAA Order 5190.66. o Review of existing airport lease agreements and on -airport land use based upon airport grant assurance compliance requirements o Identifying current and ultimate aircraft demand and design aircraft. o Identify existing and potential aircraft approach and departure obstructions, etc. Project Objective: Since the goal of this master plan is to provide the City of Sebastian with a cost effective framework of future airport development to satisfy aviation demand while considering both environmental and socioeconomic impacts, elements of this Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-2 master planning process will vary in complexity and level of detail. Further, as part of continued airport development, approved and recommended sustainability principles (i.e. economic, community, operational and environmental) will be incorporated into the planning process in varying degrees based upon need and identified goals to assist airport sponsors in creating an efficient road map for future development in line with the City and State's ongoing sustainable efforts. This project involves the preparation of an Airport Master Plan Update and Airport Layout Plan (ALP) for the Sebastian Municipal Airport (X26) in accordance with the requirements of the Federal Aviation Administration (FAA), the Florida Department of Transportation (FDOT) and the needs of the City of Sebastian, the Airport sponsor. The services described in this scope of work will be conducted by the consultant and its team of sub consultants in accordance with FAA Advisory Circulars (AC) 150/5070-6B, Airport Master Plans, AC 150/5300-13A, Airport Design,; FAA Program Guidance Letters, FAA Standard Operating Procedures, FAA Airport Improvement Handbook and FDOT Airport Master Planning Guidebook, Airport Sustainable Program Guidebook, FDOT Procedural Guidance 725-040-100-e, Airport Master Plans, and Procedural Guidance 725-040-040- h, Aviation Program Management, as well as other relevant guidance as needed. The master plan project approach is outlined in the following tasks and sub -elements contained in this Scope of Work. The level of detail associated with each task has and will be refined to meet the specific needs of the airport, its tenants, the City of Sebastian and the community as a whole. In conjunction with this approach, a detailed fee schedule of all AIP eligible master plan elements is provided in Exhibit B, Project Cost Breakdown, and a preliminary production schedule is provided in Exhibit C. PROJECT METHODOLOGY: PHASE 1 — PROJECT FORMULATION Task 1.1— Project Scope and Schedule TKDA will coordinate with the City of Sebastian (Sponsor), FDOT and FAA regarding the eligible project scope, cost and schedule. The Sponsor will obtain an independent fee review as required under 2 CFR §200.323 and FAA Advisory Circular (AC) 150/5100- 14E, Architectural, Engineering and Planning Consultant Services for Airport Grant Projects. Following completion of the independent fee review and Sponsor approval, the final scope and fee estimate will be submitted to FDOT and FAA for approval. Task 1.2 — Project Specific CIP Updates TKDA will assist the City of Sebastian with project -specific capital improvement plan (CIP) updates related to this Master Plan and Airport Layout Plan update. Task 1.3 — Project Funding Coordination TKDA will coordinate with FOOT and FAA regarding applicable funding programs for the Project in order to determine eligible federal share and AIP source of funds. Task 1.4 — Grant Pre -Application Package Using guidance provided in FAA Airport Standard Operating Procedures (ARP SOP) 6.00, FAA Review and Approval of an Airport Improvement Program (AIP) Grant Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-3 Application, TKDA will prepare and submit to FAA and FOOT the FAA Grant Pre - Application Package associated with this project. PHASE 2 — MASTER PLAN UPDATE ELEMENT 1 — PROJECT GOALS AND OBJECTIVES Task 1.1 — Establish of Technical Advisory Committee (TAC) A Technical Advisory Committee will be created to provide technical review of the working papers and to provide input into the entire master plan process. This committee will be assembled by Airport Management, and is anticipated to include airport staff as well as representatives from FAA, FDOT, City of Sebastian (including a representation for economic development), Indian River County, airport tenants and public/community representatives. Task 1.2 — Establish Planning and Sustainable Goals Effective airport short and long-term planning must evaluate and integrate a number of requirements to facilitate long-term airport sustainability. Following the financial crisis of 2007 and concerns of global warming, Airports are implementing operational, financial, environmental and community -supported development. initiation of this Master Plan will include a meeting with the City of Sebastian Airport Staff, FAA, FDOT and members of the TAC to identify short and long-term planning and sustainability goals and objectives to be addressed in the Master Plan Update. Task 1.3 - Establish Planning and Sustainability Targets and Project Policy/Mission Statement As part of these first meetings with the Airport Advisory committee, staff and Agencies, planning and sustainability targets will be developed using guidance from the update FDOT and FAA planning and sustainability guidebooks as well as other industry and local data. From this information, a project and overall Airport mission statement will be created which will guide not only master planning development but will provide the basis for airport marketing, financing, environmental and engineering design. Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-4 ELEMENT 2 — EXISTING CONDITIONS Task 2.1 — Background Historical data and previous reports will be used to provide a complete historical background of Airport, including its role within the regional and state aviation system as well as within the regional community. Recent studies will be used for comparative purposes, thus providing benchmarks for measurement against anticipated activity. Existing documents including previous planning studies, design drawings, inspection reports, airfield pavement data, airfield pavement evaluation reports, leases, obstruction charts, approach plates, and as -built drawings of structures on the Airport will be obtained and analyzed for their content. Documents to be obtained and reviewed include, but may not be limited to: • Previous Airport Master Plan/Noise Compatibility Studies • Current Airport Layout Plan Drawings (digital required) • FAA Terminal Area Forecasts i Florida Aviation System Plan • FAA 5010 Form (Airport Master Records) • Area Socioeconomic Data • As -Built Drawings of Airport Buildings and Facilities • NOAA Obstruction Chart • Area Land Use and Zoning Information • Airfield PCI Study • Current Capital Improvement Program • Airport Property Map and Detailed Property Information • Area Transportation Pians and Existing Traffic Counts, and • If available: • City of Sebastian Comprehensive Plan • Indian River County Comprehensive Plan • Any airport or local business planning or economic studies, etc. Task 2.2 - Inventory Airport Physical Facilities The physical facilities inventory will consist of an on-site review of existing airfield and landside facilities and infrastructure with attention being paid to their size, condition, use, configuration, and adequacy under current operating conditions. This information will be used to evaluate the effectiveness of the individual facility, and any interrelationship between developed use and associated impacts to operations and capacity. Additionally, the evaluation of existing facilities will serve to identify inadequate infrastructure, if any, requiring immediate attention. Key elements to be addressed include: Airfield Facilities: Runway/taxiway configuration including dimensions, pavement strength, and condition (where available); markings; signage; lighting; navigational aids; imaginary surfaces, safety and protection zones, magnetic headings; weather reporting facilities; and access to/from the airport operational areas will be identified. Aviation Businesses/General Aviation Facilities: Structures devoted on - airport aviation businesses as well as other general aviation facilities will be identified and evaluated as to their size, use (i.e. maintenance hangar, storage hangar, office, etc.), age, and/or condition. Also included in the Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-5 inventory will be a description of the services provided by any on -airport aviation business. General aviation facilities including ramp areas, number of tie -downs, hangars by type (conventional, T -Hangar, Port -a -Port, etc.) will be identified and quantified by area or other appropriate measure. Age and condition of each facility will be identified to the extent feasible as will the utilization and location of the facility on the airport. Flight Training Facilities: Structures devoted to use for Flight Training activities will be identified and evaluated as to their size, use, age and condition. Number of aircraft, ramp areas, tie -downs, and other facilities will be evaluated and quantified. The age and condition of each facility will be identified, where feasible, as will utilization, location and access to the facility on the airport. Skydiving Facilities: X26 is home to Skydive Sebastian, which is located on the northwest portion of the Airport. Skydiving demand and associated operations are and continue to steadily increase. The City of Sebastian in conjunction with Skydive Sebastian held their first skydiving festival in September 2015 as well as participated in the Skydive Sebastian INVASION 4 day event at the Airport. Based upon continued demand, additional skydiving facilities are needed to support existing and anticipated demand. In an effort to support Skydiving operations at X26, the City installed a shallow swoop pond on the Airport for skydiving training and events. Since skydiving occurs year round at X26, infrastructure and operational procedures will be reviewed. Due to the high use of X26 by student pilots, careful consideration of "jump and landing areas" will be evaluated in order to preserve a safe environment. Skydiving facilities will be identified as to their location, size, current condition, overall use, as well as local responsibility (sky diving operator or City of Sebastian/Airport Management). Sky diving recommendations will be made, which will coordinate with ultimate airfield, terminal and GA development to maintain continued safe operations. This information will also be shown on the updated Airport Layout Plan (ALP). Support Facilities: Airport support facilities to be inventoried will include, but not necessarily be limited to, airport administration needs, fueling facilities, airport maintenance facilities and airport equipment, including security requirements (additional fencing, cameras, gates, etc.) as well as any specific facility requirements needed to support current or potential tenant operations. Landside Facilities and Airport Access: Access to the Airport from the South and East is provided via Main Street which connects to Airport Drive East allowing access to the Sebastian Municipal Golf Course and Eagle's Nest Restaurant as well as Airport Terminal and Corporate Hangar facilities. The west side of the Airfield, which supports Skydive Sebastian, Velocity and various aircraft storage facilities may be accessed via Roseland Road and Central Airport Drive as well as Airport Drive West. Since both Roseland Road and Airport Drive West intersect the runway protection zones of Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-6 Runways 5 and 10, these roads will be evaluated for the highest objects and use as well as the viability of relocation. This inventory will concentrate on road access, both on and off airport in addition to the adequacy/utilization and condition of parking facilities as well as camping facilities associated with Skydive Sebastian. The existing road network serving the Airport and adjacent parcels will be identified and classified by the type (number of lanes and collector, arterial, etc.) and by linkage to other major roadways or highways. The primary means of accessing the airport facilities will be identified as well as any potential impacts to accessibility. The intent of this baseline analysis is to understand existing development plans in order to determine options for potential airport alternatives development and evaluation. Additionally, the transportation improvement plans of the City, County and State will be reviewed to identify pending roadway improvements that may impact Airport accessibility. Roadway studies will be requested from both the City and the County in an effort to identify any connectivity issues as well as identify existing and potential development which may impede Airport development. Special attention will be given to the runway safety areas and protection zones (RSA and RPZ) as well as clear zone requirements. Where specific data is not available, a general indication of quantity and condition will be developed through on-site evaluations as well as discussions with City staff and other significant users on the airport. Weather Data: Wind rose information required for various analyses as well as the ALP drawing will be obtained from the National Climatic Data Center for a historical period of ten years. The cost of this information is factored into the project budget. Other Facilities: This subtask includes any and all facilities that have recently been completed or are in the process of being constructed since the last master plan update. This section will identify and evaluate any additional aviation and non -aviation facilities and leaseholds, including currently Agency approved imminent and concurrent land use (e.g. agricultural, municipal services, through the fence operations) that exist on the airport property as well as review current lease agreements and revenue associated with these facilities in order to determine conformance with regulatory requirements in addition to identifying when potential properties and facilities may become available for future airport development. This data will be further evaluated in later sections of the master plan report including airport alternative development and implementation plan. Task 2.3 - Airspace/Air Traffic Control/Obstructions X26 is not equipped with an Air Traffic Control Tower. Therefore, flight service is provided by the St. Petersburg Flight Service Station (FSS), and Miami Center ARTCC provides regional air traffic control services. X26 is equipped with a SuperAWOS, which provides weather and some flight data information. However, due to its age and condition, Airport Management intends to upgrade to an AWOS II which provides separate radio frequencies for weather and flight traffic data. As part of the inventory Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-7 evaluation, a review of terminal and nearby airways, restricted areas, intersections will be undertaken to determine if any current or potential obstructions to air navigation. This task will identify both the equipment that is used by aircraft operating in the airport vicinity and any operational limitations due to traffic interactions with other airports and/or specific types of operations, reserved airspace, missed approach courses, noise abatement procedures, existing or planned airfield facilities, existing or programmed navigational aids, local topography, etc. Task 2.4—Vicinity Land Use/Land Use Controls A review will be conducted of existing land use mapping, updated aerial photography, comprehensive plans, and zoning controls, and other documentation pertaining to current and future land use in the vicinity of the airport. Existing zoning districts code will be reviewed to identify existing and potential incompatible land use areas contiguous to the airport. Local planning officials will be interviewed to identify the potential for future residential, commercial, and industrial development in the vicinity of the airport and particularly along the extended centerline of Runway 5/23 and proposed Runway 10/28. A review of existing zoning controls and land use management within the vicinity of the airport will be reviewed in order to determine the potential impact on future airport development. Task 2.5 - Exhibit'A' Encumbered Airport Property Inventory Title Search Per ARP Standard Operating Procedures 3.0, October 1, 2013, an Airport Sponsor has a federal obligation to submit accurate Exhibit'A' Airport Property Inventory Maps (Exhibit'A') when applying for and prior to execution of certain federal grants. The Exhibit A provides a snapshot of the current inventory of land parcels that make up the dedicated airport property, and indicates how the land was acquired, the funding source for the land and if the land was conveyed as Federal surplus land or Government Property. Other detached parcels owned by the Airport Sponsor that are dedicated to airport purposes must also be shown on the Exhibit'A'. The Exhibit'A' must show all dedicated airport property regardless of the type of funds (AIP, state, local, etc.) used to acquire that property. All land described in a project application and shown on an Exhibit 'A' constitutes the airport property federally obligated for compliance under the terms and covenants of a grant agreement'. Thus, as part of the Exhibit'A' development, a local land services company will provide an ownership and encumbrance report, which will include historical, existing and future (as identified in Elements 3, 4 and 5, Facility Requirements and Alternatives Analysis) property title search, property interest data (i.e. easements, right of first refusal, and other rights), grant history, in addition to identifying any other property rights that the Airport has given or is expected to release, non -aeronautical and concurrent uses or airport property, in addition to historical and likely FAA approval status and next steps. This data will be provided to TKDA to be incorporated into the Airport Inventory, facility and alternative development analysis narrative chapters, associated appendices, as well as the Airport Layout Plan update. This report will conform to the requirements outlined in ARP SOP 3.00 and FAA Advisory Circular 150/5100-17, Land acquisition and Relocation Assistance for Airport Improvement Program (AIP) Assisted Projects. TKDA will work with the fee sponsor to review the ownership and encumbrance report and determine the appropriate level of effort required. All hard copy documentation received FAA ARP SOP 3.0, Standard Operating Procedure (SOP) for FAA Review of Exhibit'A' Airport Property Inventory Maps, October 1, 2013 Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-8 as part of this analysis will be transferred to the client and Regulatory Agencies (FAA ADO and FDOT) at the completion of this project. Supporting Sub Consultant: To Be Determined Task 2.6 — Existing Utility and Drainage Infrastructure Airport economic growth and associated development (e.g. hangars, on -airport businesses, airport support infrastructure, etc.) are dependent upon availability and ease of access to essential on -airport utilities such as water, sewer, electrical, communications, etc. Utility providers serving the airport will be contacted to identify the adequacy of the services provided, available capacity, the location of service lines and their size, as well as other characteristics impacting service to existing or proposed development areas on the airport. In addition, a baseline evaluation of existing storm drainage, retention facilities and other drainage facilities will be developed in order to identify potential outfall limits and as well as areas where additional drainage may be required to support anticipated facility and tenant demands over the twenty-year planning period. Both utility and stormwater requirements will be addressed as part of the facility requirements and alternative development analyses. Task 2.7 — Environmental Inventory The northwest portion of the Airport property is designated as conservation according to the last master plan update, and the Airport property also includes a 100 foot scrub jay buffer to the northeast as well as 50 foot vegetated barrier/buffer located within the airport fenceline to the southwest. Thus, as required by both FAA and FDOT guidance, a baseline inventory of past, current and potential affected environments on and adjacent to the airport will be developed that will be used to identify any issues that need to be resolved as well as determine potential impacts to proposed airport development. This inventory will include site visits and literature review/research to determine ownership, ordinances, jurisdiction, and to identify any other regulatory requirements which may impact existing and future development. This inventory will be coordinated with federal, state, and local environmental resource agencies, and will consist of the following items based upon requirements outlined in FAA Order 1050.1E, Environmental Impacts, Policies and Procedures, Order 5050.48, National Environmental Policy Act (NEPA) Implementing Instructions for Airport Projects, FAA Advisory Circular 150-5070-6B, Airport Master Plans, Airport Improvement Program Handbook, FAA Order 5100.38D, etc.: + Noise + Air Quality + Solid waste generation and disposal + Prime and unique farmland + Water quality and shoreline impacts + Land use and construction environmental assessment + Cultural Resources + Section 4(f) Properties + Wetlands and Floodplains + Threatened and Endangered Species + Biotic Communities + Hazardous Materials/Waste Sites + Road Plans Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-9 + Clear Runway Protection Zones or impact evaluation, etc. Task 2.8 — Solid Waste Audit In addition as required by the FAA Modernization and Reform Act 2012 (Public Law 112- 95), a baseline solid waste audit will be performed which will draw upon information provided by Airport and City staff as well as be consistent with applicable State and local recycling laws. This subtask will also include: • The feasibility of solid waste recycling at the Airport 4 Minimizing the generation of solid waste at the Airport 4 Operation and maintenance requirements • Review of waste management contracts, and • The potential for cost savings or the generation of revenue. It is important to note that the scope of the solid waste audit and recycling plan will depend upon the following factors: • Local markets for recycling commodities including batteries • Local recycling infrastructure • The Airport's waste stream • Airport size, location and layout This data will be used to develop a feasible airport solid waste recycling plan as well as the potential implementation of other recycling efforts. Task 2.9 — Wildlife Hazard Site Visit Per AAS -300, airports with less than 75,000 or 100 based jet aircraft typically only require a wildlife hazard site visit to determine any potential wildlife impacts to aviation operations. However, to meet the requirements of FAA Grant Assurance 19, which includes providing advanced notice of any condition affecting aeronautical use of the airport, a Wildlife Hazard Site Visit (WHSV) will be performed as part of this master plan update. This WHSV will be performed by a certified wildlife biologist per FAA AC 150/5200-36A, and this data will provide a baseline of environmental conditions at the airport as well as identify any future actions that should be discussed in the Master Plan including necessary projects (e.g. additional fencing, drainage infrastructure, infrastructure removal, land use, etc.) to be included on the Airport Layout Plan. Any operational changes (nest removal, mowing, clearing ditches, etc.) recommended will be provided as part of the Site Visit Analysis (Appendix D of this report). "As part of a Site visit, the Qualified Airport Wildlife Biologist collects and compiles information on the airport's wildlife hazard history, documented and suspected wildlife hazards, habitat attractants, control activities, airport operations procedures, communications of hazards through ATC and pilots, aircraft operations and scheduling. A Site visit is typically conducted over a period of two to three days during which a Qualified Airport Wildlife Biologist evaluates the habitat on and surrounding the airport P If a triggering event is proposed in the master plan update, an alternative analysis is required. The near-term project will require routing to FAA Headquarters while later (mid and long-term) projects will be coordinated with the FAA Airport District Office only. Technical documentation will be provided in an appendices to the report with a discussion/overview provided within the report chapter(s). Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-10 and records direct or indirect wildlife observations; and reviews the current Plan, current wildlife management activities and airport wildlife strike data."3 Based upon this guidance, an Airport Wildlife Hazard Site Visit checklist is provided in Exhibit A-1 to this scope of work. The WHSV upon completion will be submitted to FAA to determine if a Wildlife Hazard Assessment (WHA) is warranted. If the FAA deems that a WHA is required, it will be a separate action performed independent of this master plan scope. If, however, the FAA supports the conclusions that a WHA is not required at this time, a Wildlife Hazard Management Plan (WHMP) will still be developed as part of this scope of work in conjunction with Element 5, Refined Analysis and Recommended Development. Task 2.10 - Airport User Interviews / Questionnaires Airport users and existing tenants, including Velocity, Skydive Sebastian, Sheltair, Sebastian Municipal Golf Course, Sebastian Aero Services, LoPresti Aviation, Pilots Paradise as well as Vero Beach based FlightSafety Academy, local businesses, City Chamber of Commerce, etc., will either be interviewed and/or requested to complete questionnaires. The tenants might be reached through one of these communication means: + In person interview + Phone interview + Electronic or online questionnaire + Paper questionnaire Both the interview and survey will solicit information pertaining to a description of current facilities, levels of activity conducted from the airport, perceived airport needs, future plans and contract expansion opportunities, type of aircraft used, and anticipated fleet additions and changes. A listing of airport tenants, provided by the airport sponsor, will be used to identify organization contacts for the tenant survey distribution and interviews. User data will be obtained from the City of Sebastian Airport Management as well as various online data sources. Results will be tabulated and utilized in subsequent analyses. Survey instrument(s) will be prepared as part of this task in close consultation with the City staff. Digital photographs will also be taken of landside and airside facilities as well as contiguous properties to supplement the data collection effort and to serve as a resource for subsequent master planning tasks. Task 2.11 — Prepare and Submit Chapters One, Airport Goals and Objectives, Two, Airport Existing Conditions, and associated Appendices As part of this project, TKDA will upload each chapter of the master plan to a designated password protected FTP site. As draft chapters are updated based upon comments 3 FAA Advisory Circular 150/5200 -XX (Draft), Protocol for the Conduct and Review of Wildlife Hazard Site Visits, Wildlife Hazard Assessments, and Wildlife Hazard Management Plans, AAS - 300, Pg. 37 Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-11 received, each chapter will be renamed to identify the update and uploaded to the FTP site for download. Hard copies of the chapters will be provided if requested. As data is uploaded to the site, electronic notifications will be sent to the client and all members of the Technical Advisory Committee. Chapter One will outline the planning and sustainability goals and objectives of the master plan as well as participants. Chapter Two will include the issues and findings identified as part of the inventory analysis, and will present, in narrative and graphic format, information relating to airport facilities, the access system serving the airport including existing road and RPZ impacts, historical and existing ownership, easement and other encumbered property data, environmental features affecting the current airport property and tracts immediately adjacent to the airport, existing airspace and obstruction considerations, summary of solid waste recycling and sustainability recommendations in addition to data related to land use compatibility. Appendices A, B and C, respectively, will provide a summary of airport tenant and user input, airport property historical land transfer and ownership data obtained from the ongoing ownership and encumbrance report, and baseline sustainability and baseline Airport recycling, reuse and waste reduction audit. Electronic copies will initially be submitted to City of Sebastian staff for review approximately two weeks prior to distribution to the Technical Advisory Committee (TAC). Following the client's approval, electronic copies will be submitted to the Technical Advisory Committee, which will include FAA ADO and FDOT personnel, for review and comments. A comment period of approximately two to three weeks is requested in an effort to keep the project moving forward and on -schedule. ELEMENT 3 - AVIATION ACTIVITY FORECASTS AND CRITICAL DESIGN AIRCRAFT Task 3.1 - Inventory Historical and Current Air Traffic Activity Historical and current air traffic activity at X26 will be obtained from various known and approved sources to provide a baseline for aviation activity demand forecasts. Information concerning the level of activity for any general aviation operation (both local and itinerant as well as skydiving, flight training, ultralight, and potentially experimental operations), any military operations as well as fuel sales and based aircraft (by aircraft type) will be sought. Peak hourly operations, daily, monthly, and annual activity will be quantified from site visits, survey data and interviews, previous planning documentation, airport management data, and tenant information as described in the previous section. Any other pertinent data will be obtained from Airport records, local management, the FAA, FDOT and any other legitimate sources of data. Task 3.2 — Identification of Factors or Opportunities Affecting Activity Levels A key element in the forecast process is the identification of potential for new or expanded activity by existing airport users, as well as the potential for the airport to secure new services and operators. This task will analyze potential changes that could impact the level or type of activity at the Airport, and will identify potential niche markets that could be the basis for either expanding existing activity or initiating new activity at X26. Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-12 In addition, economic, social, political and industry trends, such as impacts of global terrorism, fluctuating fuel prices, fluctuating interest rates and other financial indicators, along with new technology, rules and changes to the general aviation fleet mix with regard to the historical and future impacts on operations will be evaluated. These factors along with the recently updated FAA Aerospace Forecasts, FDOT State Aviation System Plan, FAA Terminal Area Forecast, Bombardier and Boeing Aircraft forecasts as well as the FAA General Aviation Airports Report will be used to forecast likely short, mid-term and long-term planning activity levels and anticipated fleet mix at the airport during the twenty -plus planning period. Task 3.3 — Aviation Activity Forecasts The purpose of this task is the development of single scenario planning activity level forecasts (i.e. operations, based aircraft, instrument operations, etc.) reflecting induced demand conditions. New activity forecasts will be derived utilizing recent historical demand patterns, trends experienced at the Airport, and the potential range of changes in aviation activity locally that could occur over the planning horizon (represented by the 2015-2035 timeframe). Forecasts will be prepared using FAA -accepted methodologies (regression, market share, trend analyses, etc.) and will be compared against other recently prepared forecasts, such as the 2015/2016 FAA Terminal Area Forecasts (TAF) and Florida State Aviation System Plan to identify the most realistic scenario forecast of future aviation demand at X26. Activity projections will be provided using planning activity levels, such as short (2017-2021), mid (2022-2026), and long (2027 — 2037) horizons. This will allow the sponsor to focus on the need to plan for aviation activity levels rather than specific timelines for airport development. The aviation activity forecasts will comprise projections of annual activity for aircraft operations. Forecast activity will include: + Total Airport Operations + Itinerant Air Taxi/Charter, General Aviation and Military Operations + Local General Aviation and Military Operations + General Aviation Passenger Enplanements + General Aviation Operations by Type (i.e. training, skydiving, experimental, ultralights, gliders, county/law enforcement operations, etc.) + Instrument Operations + Based Aircraft + Aircraft Mix (i.e. single engine, multi -engine, turboprop, jet, helicopter and experimental) + Critical Aircraft demand, + Peak Month and Design Hour Operations to determine Aircraft Parking and Storage requirements, and + Fuel flowage demand by type Forecast data will be compared to FAA TAF and Florida SASP forecasts which may be adjusted to reflect current base year, 2015, operational data as reflected in the Airporfs Master Record, Form 5010. Task 3.4 - Existing and Ultimate Design Aircraft Using information obtained during interviews and surveys performed as part of the airport inventory as well as historical operational data, the characteristics of the current aircraft fleet will be identified, paying particular attention to the number, fleet mixtaircraft type, and stage length of operations by aircraft. Additionally, using the forecast data and Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-13 future fleet mix evaluation, the existing and ultimate design aircraft or family of aircraft will be determined for the Airport and Runways 10/28 and 5/23. This data will be used in Element 4 to identify existing and potential facility requirement gaps in the current airfield design including airfield dimensional requirements and NAVAIDs needed to support existing and forecast aircraft operations. Task 3.5 — Forecast Resource Consumption Using the baseline information obtained in Elements 1 and 2, resource consumption estimates based upon likely forecast demand will be determined to see where it may be financially and operationally feasible to decrease solid waste, energy use, water use, materials as well as potential reuse of construction materials or the use of new and more efficient structural materials. This section will also consider the high priority sustainable actions that the City of Sebastian and Indian River County has and is putting in place. Furthermore, other Airport in the area that host special events and similar operafions will also be polled to determine typical "hot issue' resource use and what they may be doing to decrease overall resource consumption. Task 3.6 — Prepare and Submit Chapter Three, Aviation Activity Forecasts and Design Aircraft, and Appendices Chapter Three will address historical and current activity levels, factors impacting X26, including the analytical portions of the forecast process, as well as identifying the existing and ultimate design aircraft for the airfield and Runways 10/28 and 5/23. This task will be developed to be consistent with the FAA recommended guidelines "Review and Approval of Aviation Forecasts, June 2008". Summary forecast data will be presented Chapter Three, and the forecast spreadsheets will be provided in Appendix D as supplemental information. This data along with the Airport inventory will be used as the baseline for all remaining analysis. As noted in Task 2.11, electronic copies of Chapter Three will first be provided to the City of Sebastian Airport Staff for review and approval, and then submitted to the Technical Advisory Committee for their review and comment. All reports will be submitted electronically unless requested otherwise, and a two to three week comment period is requested to receive TAC comments for inclusion into the report. Again, all updated chapters will be available via the TKDA website until replaced by draft final report. ELEMENT 4 - FACILITY REQUIREMENTS This element of the planning study is intended to provide a comparison of existing airport facilities versus existing and projected demand levels related to the identification of airside and landside development necessary, if any, to meet forecast demand. To the maximum extent feasible, future facility requirements will be based upon activity levels or demand related triggers rather than the use of arbitrary points of time, since actual needs will be determined by the level of demand rather than the number of years. It should also be noted that demand may already exceed existing facilities or that new federal or state requirements will require the immediate construction of new facilities. These issues will be considered in detail and will provide the foundation for various airport development alternatives at X26. Task 4.1 — Airspace and Airfield Capacity and Delay This study is intended to identify what, if any, of the envisioned airfield improvements at MKT may be necessary over the course of the twenty-year planning horizon Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-14 encompassed in this study, with particular emphasis on those improvements needed in the 0-5 year horizon and 6-10 year time frame. The FAA's methodology for assessing airfield capacity and delay as delineated in FAA Advisory Circular 150/5060-5 is regularly used to assess airfield capacity. Based on the adjustments made to existing forecasts as delineated in Task Three, the capacity assessment presented in the previously approved master plan update will be validated to determine what, if any modifications to the current Annual Service Volume (ASV) based capacity assessment may be necessary due to changes in fleet mix as defined by the adjusted forecasts. Analysis undertaken in this element is intended to support the airfield improvements identified in the previous airport master plan update. The result of the capacity assessment will be expressed in terms of the hourly and annual service volume of the airfield, in minutes of delay per aircraft operation, and total estimated annual delay per operation. Task 4.2 - Determine Airfield Facility Requirements Using all relevant information from previous documentation, the master plan tasks and airfield planning criteria, a preliminary list of airfield facility requirements necessary to meet projected levels of demand for the five, ten, and twenty-year time frames will be prepared based upon FAA and FDOT guidance. These facility requirements will be based upon accepted airport planning criteria knowledge; the expertise of the Technical Advisory Committee members and the Consultant; and forecast aviation activity for X26. At a minimum, the evaluation of airfield facility requirements will include: + Runways, and taxiways (length, width, size and/or strength); + Airfield lighting and marking; + Aircraft parking aprons (size and strength) and facilities (hangars); + Aircraft support facilities; and + Navigational aids and associated instrument approaches Airfield facility needs will be identified in terms of linear feet, strength, etc., and will be compared to existing facilities where possible in order to identify excess or deficient facility capacity. Airport facility needs, such as apron or hangar space, will be quantified either by area or total number required. As for any specific recommendations or requirements or changes related to NextGen and/or RNAV/GPS approach requirements, TKDA will solicit information from the FAA Airport District Office (ADO) in Orlando. Note X26 is currently equipped with RNAV approaches to both 5 and 23, but with a minimum 1- mile visibility requirement. It should be noted that the extent of analysis relative to proposed instrument approach procedures will be limited, and will not be of a level to definitively determine exact criteria, but may, instead, identify desired approach enhancements and discuss issues of feasibility in a general nature. Task 4.3 - Determine General Aviation Facility Requirements Using the results of previous tasks and accepted planning criteria, the general aviation facilities necessary to meet both current and projected levels of demand for the five, ten and twenty-year planning horizon will be determined. General aviation facility requirements to be assessed include: + Aircraft Ramp and Parking Area (including size and number) + Aircraft Storage Hangar Positions (by hangar type) + T -Hangar Positions Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-15 + Conventional Hangar Positions + Shade Hangars + Aviation Terminal Needs and Support Facilities + Fixed Base Operator (FBO) Facilities + Access Facilities and Vehicle Parking Areas This assessment will quantify future development items needed to maintain an adequate level of service, function, and operation at the Airport. Task 4.4 - Determine Airport Support Facility Requirements Using information provided by existing studies and aviation planning criteria established under preceding tasks, a set of facility requirements addressing the Airport facilities necessary to support the airfield, general aviation areas, and their related activity will be provided. Requirements for facilities, such as aircraft fueling, safety and security requirements, and airport maintenance and equipment will be developed under this task. Task 4.6 — Ground Access, Circulation and Parking Requirements Based upon discussions with Airport staff and the location of existing facilities on the Airport, concerns were raised regarding vehicles using the runways and taxiways to access different portions of the airfield. In addition, vehicle access to different points of the airfield must be evaluated in order to limit intrusions into the active Airport Operating Areas (AOA). On-site parking both related to current tenants and visitors as well as potential needs to support various special events at the Airport will also be reviewed and recommendations will be made to control unauthorized access to the active airfield areas. Task 4.6 - Quantify Land Area and Other Requirements X26 has committed much of its available land area to the development of either airfield facilities or general aviation facilities. Remaining areas of land not presently committed to development will be analyzed for the best -recommended use. Typically, areas designated on the Airport Layout Plan as conservation must demonstrate that this area is never needed for aeronautical use and that the cost of relocation is prohibitive. Since the Northwest portion of the Airport property was designated on the 2007 Airport Layout Plan as conservation, data will be gathered to determine if this area is needed to support aviation development and this document will outline the current reasoning for maintaining the area as a conservation easement as well as the likely costs for relocation. Further, based upon existing and forecast facility requirements, land adjacent to the existing Airport property will be identified for potential acquisition in order to protect the existing runway protection zones. A Title Search and Ownership report will be executed, and preliminary discussions may be held with owners at the behest of the City. Acquisition of land parcels to support long-term aviation development at X26 will be addressed in Chapters 5, Airport Alternatives, and 6, Alternative Evaluation and Recommended Development, which will identify the timing and likely cost of acquisition, either via fee simple or as potential easements. Task 4.7 — Refine Sustainability Goals and Objectives The State of Florida continues to take measures and provide funding for projects to maintain and support Florida's resources. The City of Sebastian in 2015 was recently awarded $175,000 by the Florida Department of Environmental Protection for Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-16 stormwater improvements which will reduce nutrients from entering Indian River Lagoon and St. Sebastian River. The City is actively working with various state and local agencies in addition to community organizations to identify opportunities to integrate sustainable practices within the City and County as well as at the Airport. Looking at "best practices" for similar communities throughout the state as well as nationally, sustainability options and objectives which could be implemented at the Airport will be further refined based upon anticipated operations, facility requirements, community support, financial feasibility as well as potential environmental concerns and opportunities. Further, as part of this facility analyses, utility requirements including an extension of trunk lines to accommodate development will be identified as will the feasibility of implementing on -airport solid waste recycling measures based upon current recycling contracts as well as local and State laws. Working with the City's Community Development staff and Indian River County's Solid Waste/Recycling Department staff, general recommendations will be provided for minimizing solid waste generation associated with airport construction, operations and maintenance. Lastly, additional sustainable airport recommendations will be offered considering both local and regional recycling and sustainability initiatives as well as the City's and County's planning priorities. This information will be provided as an appendix to the report for ease of distribution to tenants and staff. Task 4.8 - Prepare and Submit Chapter Four, Airport Facility Requirements, and Appendices Chapter Four and associated appendices will document the information and evaluations of the facility requirements process as well as the recommended recycling program. Information identified within this chapter will be used to determine airport alternative development as well as project phasing and costs. Again, this chapter will be provided first to the Sponsor for review and then to the Technical Advisory Committee as illustrated in Exhibit C, Project Schedule. ELEMENT 5 - AIRPORT ALTERNATIVES This phase of the study includes the development of alternative concepts to address forecast demand, identified facility requirement gaps, as well as likely affected environmental and land use concerns to meet long-term demand. This process will begin with a "brainstorming" session with the Client and TAC to generate a broad range of development possibilities. Initial screening will narrow the range of possibilities to those reasonable alternatives that meet the planning need for each element, which will then undergo more intensive development and evaluation. Specific issues to be considered during development of alternative concepts include: + Technical feasibility; + Economic and fiscal soundness; + Aeronautical utility; + Viability of phased development; 4 Environmental factors; + Access to the various functional areas of the Airport; 4 Future expansion potential beyond the 20 -year planning horizon, etc. Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-17 This task consists of three tiers of analysis: identification, refinement, and selection. As this process progresses, the number of alternatives will dwindle and the level of layout detail and analysis will increase a preferred alternative is developed. The functional areas to be studied include: the airfield, terminal/FBO area and landside including auto parking, overall airport land use, general aviation, and surface transportation. A weighted matrix will be created to evaluate each proposed alternative in relation to each of the factors listed above (e.g. economic, environmental, operational, etc.) in order to identify viable alternative development options. Ultimately, this program will determine how best to expand and improve the existing facilities at the airport in terms of overall efficiency. Its goal is to optimize on -airport land use, maximize the capacity and economically viability of the existing facilities, and identify the facilities and practical stages of future development. Task 5.1 - Airfield Alternatives On the basis of the airport facility requirements established in preceding elements, preliminary airfield development alternatives will be formulated to lay the foundation for future environmental review and to build upon the development of airside facilities at X26. As illustrated in the 2007 Airport Layout Plan, two roads intersect the runway protection zones of both Runway 5 and 10. Therefore, based upon these issues, new regulatory requirements and potential design and environmental impacts identified as part of the inventory and facility requirements, multiple airfield alternatives will be considered to varying degrees based upon likely viability using the criteria shown under Element 5. These airfield alternatives may include, but not be limited to: various runway length options and alignments to provide the needed length as well as mitigate roadway impacts within the RPZs; the potential of relocating one of the roads or other options based upon an runway protection zone analysis; as well as other actions needed to address existing and potential design -related deficiencies on the Airport. Instrument procedures including lower minimums at the Airport associated with new NextGen technology and the requirements that would need to be met associated with these improvements will be based on runway alignment schemes for development within existing airport boundaries or within expanded airport boundaries. This task will be conducted simultaneously with following tasks and will result in a series of overall development options for the current airport site and adjacent properties. Airfield alternatives will be analyzed based on their ability to satisfy the identified facility and infrastructure requirements, environmental considerations, engineering factors, cost, phasing, land requirements and probability of land acquisition, community and political support, as well as ease of implementation. Task 5.2 - General Aviation Alternatives Based on facility requirements determined under a previous element, preliminary general aviation area development options will be developed within existing airport boundaries considering existing and future tenant demand, airport improvements, environmental consequences, land use, and financial sustainability. These alternatives will show the necessary development, including potential land acquisition, to accommodate the demand expected over the 20 -year planning period. This task will be conducted simultaneously with other tasks in this element and will result in a series of overall development options. General aviation alternatives will be evaluated on the basis of their efficiency in meeting identified facility requirements, engineering factors, ease of implementation, costs, phasing, airside and landside Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-18 accessibility, and environmental considerations leading to the selection of the options best satisfying the identified need. Task 5.3 — Support Facilities Based on the ultimate airfield configuration and other changes proposed in the master plan, there may be a need to reconsider the placement of some support facilities at the airport. This analysis will identify the key airport support facilities at X26 and define alternatives to address these and other issues that may arise in the planning process. Airport support facility alternatives will be evaluated on the basis of their efficiency in meeting identified facility requirements, engineering factors, impact on other airport development options, ease of implementation, costs, phasing, airside and landside accessibility and environmental considerations leading to the selection of the options best satisfying the identified need. Task 5.4 — Landside and Land Use Alternatives As part of the facility requirements evaluation (Element 4), land use and RPZ impacts were identified. In order to establish the preferred airport development, an expanded RPZ evaluation will be performed to identify land use impacts and mitigation options. When comparing existing and planned land uses, recommendations will be made to ensure that compatibility exists since incompatible land use at or near an airport may create hazards to air navigation or reduction of airport utility. As part of the analysis, recommendations may include land acquisition or installation of an easement and suggestions or refinement of existing land use management techniques as well as an evaluation of highest and best land use for potential aviation and short-term non -aviation leaseholds as well as areas of significant environmental concerns. Task 5.5 - Preliminary Development Costs Using labor and materials price data from recent construction projects in the airport vicinity, potential environmental impact costs, recent property value data, and cost schedules provided by the FAA ORL ADO and FDOT, preliminary cost estimates for each airport development option, in the various alternatives considered during the planning process, will be prepared. FAA and FOOT cost schedules consist of specific costs and funding options provided by the FAA and FDOT to provide a realistic cost estimate of a project or activity. Cost schedules are based upon probabilistic measures of cost outcomes based upon historical data and risk. Thus, the alternative concept cost estimates for the Airport at this point would be calculated as a rough order of magnitude for comparison purposes only. Task 5.6 - Prepare and Submit Chapter Five, Airport Alternatives, and Appendices This chapter will focus on the alternatives developed to address the options associated with the airfield, general aviation terminal area, and all other airport facilities and uses as well as considering the interrelationships between the Airport, neighbors and locallregional plans as well as the impacts that development of individual facilities may have on other existing facilities and proposed development. As such, this chapter and associated appendices will present, in narrative and graphic format, various development alternatives explored for X26. Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-19 ELEMENT 6 - REFINED ANALYSIS AND RECOMMENDED DEVELOPMENT Task 6.1 Refined Alternatives Analyses Based on input from the Airport Sponsor, Technical Advisory Committee, regulatory agencies and the public including adjacent property owners, refinements to the analysis of alternatives will be made to address any issues raised or direction received during the review process. City and Airport staff as well as the regulatory agencies will meet with the consulting team, consider the stakeholder input, and identify the "best" components of all alternatives. A meeting summary will be prepared following coordination with City and airport staff members to document decisions and directions, which will be included in an appendix to the master plan report. The final concept may consist of one of the alternatives developed in the previous tasks or more likely a combination of options employing elements of various alternatives into a single development concept. This single hybrid concept will be reviewed using the same criteria that were employed in the previous tasks. Alternative refinement criteria will include, at a minimum: + Ability to meet short- and long-range facility requirements; + Ease of implementation; i Capital costs; + Constructability/phasing; + Flexibility and future expansion potential; and, + Public and tenant operational impacts during construction improvements. Task 6.2 - Environmental Action Plan According to the individual airport and project within the master plan, the FAA's Airports District Office (ADO) Environmental Program Manager will work with the consultant and Sponsor to determine the level of documentation for each project in accordance with FAA Order 1050.1 E. For each project identified within the preferred alternative concept, the following information will be provided: + Potential environmental impacts to natural resources; + Environmental documentation required based on FAA Order 1050.E. If a project will most likely require a categorical exclusion, an environmental assessment, or an environmental impact statement level of documentation. + Anticipated state and federal regulatory requirements; + Potential mitigation measures or options for associated environmental impacts for the proposed project. Task 6.3 —Land Use Compatibility and Mapping The Sebastian Municipal Airport is surrounded by land designated as residential, industrial, institutional and conservation. Therefore, as part of planned development, compatible land use recommendations for development contiguous to the airport will be provided in addition to identifying on -airport development that will avoid any negative impacts to existing land use, specifically residential and conservation. This data in Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-20 conjunction with the encumbered land use report will be incorporated into the Airport's land use map and Exhibit 'A' Property Map data. Task 6.5 - Recommended Development/Preliminary Capital Improvement Plan Using an evaluation matrix to consider operational performance, environmental factors, fiscal factors as well as input from the City of Sebastian, the Technical Advisory Committee and the general public, the final recommended alternative for airport development will be identified. This matrix will identify why this is the preferred alternative for future development at the Sebastian Municipal Airport. The preferred alternative development will be graphically presented in the airport layout plan and associated projects will be implemented into the Airport's capital improvement program. The recommendations from this alternative analysis will be closely coordinated with the City, as well as representatives of FDOT and the FAA, to ascertain funding viability and overall viability of the Airport development needs. Once refined alternatives have been approved by the Airport Sponsor, they cannot be revised without additional scope and fee. Based upon the recommended Airport development, a list of capital improvements including environmental, design, land acquisition, mitigation, support facilities, etc. will be identified. This will allow both the consultant and the City to obtain a "snapshot" of all proposed projects in conjunction with anticipated order of magnitude costs in 2015/2016 dollars. It is important to note that these costs will differ to some degree with the costs provided in the Financial Feasibility section of this report, but their use is primarily to identify all potential projects associated with the preferred development option. Task 6.6 - Prepare and Submit Chapter 6, Recommended Development, and Appendices A draft report of the refined development alternatives will be created in both narrative and graphic forms to document the final recommended airport alternatives including identifying parcels for potential land acquisition or disposal, summary of sustainability initiatives and preliminary project cost estimates and phasing. This chapter will also include a separate section, which provides the results of any land use and zoning considerations identified as well as environmental impacts and ultimate recommended development. ELEMENT 7 - AIRPORT LAYOUT PLAN DRAWINGS An approved Airport Layout Plan serves as the blueprint for future airport development and is necessary for the airport to receive financial assistance under the terms of the Airport and Airway Improvement Act. All components of the Airport Layout Plans Set described herein will be developed in accordance with the provisions of AC 150/5070- 66, Airport Master Plans, the FAA ALP Checklist provided by the current standard operating procedure ARP SOP 2.00 and 3.00, and FDOT ALP Preparation (January 18, 2005) submittal guidelines. All graphics and the airport layout plan drawing set will use existing photographic and photogrammetry data unless the client specifically requests a new aerial background. Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-21 Task 7.1 - Draft Airport Layout Plan Set Title Sheet A title sheet will be updated, and information concerning the airport including project number, client name and location maps will be included on this sheet. Airport Layout Plan The ALP will be updated to reflect the recommended development of future needs as identified in this study. Information on this portion of the ALP set will include, but not be limited to, the physical layout of the airport and of the physical facilities developed thereon. Also to be incorporated on the ALP sheet will be the building and facilities data, runway protection zones, taxiway systems, navigational aid critical areas, building elevations, topography, roads and parking areas, wind rose/wind coverage, declared distances table, and the airport boundary. Object, building, and any other obstruction heights will be taken from existing sources of information. Existing and proposed modifications to FAA design standards will be identified and delineated in a table, along with either the waiver allowing the modification, or the proposed method of addressing the modification. A table listing any modifications (existing and proposed) along with their proposed disposition will be incorporated onto the ALP and in the narrative chapter. The scale of the drawing will be defined at the time the ALP set is commenced and will be determined so as to provide a clearly legible drawing. Information that cannot be included on the ALP sheet due to sheet size and scaling limitations shall be incorporated onto a separate Airport Layout Plan Data sheet. This may include Airport Data, Runway Data, Wind Roses, notes, etc. Terminal Area Plan At least one terminal area plan for the airport will be updated to reflect existing and recommended development of future general aviation needs as identified in this study. The terminal concept will focus on flexibility for future expansion. The plan will include recommendations for access and parking, buildings, hangars, FBOs, and entrance roads, as well as necessary security access to the airfield. Inner Portion of Approach Surface Drawings An Inner Portion of the Approach Surface Drawing will be prepared for each runway end (four runway ends) depicting the area out to where the approach surface reaches a 100 - foot height above the runway end. The drawings will depict the airport property, location of roadways, structures, natural ground elevations and other artificial or natural features within the limits of inner portion of the approach surface. The drawings will also detail objects that penetrate approach surfaces or violate obstacle clearance criteria. Obstructions will be listed numerically in an obstruction table for each approach with data describing the obstruction type, top elevation, allowable elevation, amount of penetration, and proposed dispositions. Additionally, the drawings will depict the configuration of required safety areas off each runway end. Plan views will be superimposed on aerial photos or a detailed line drawing. Runway Departure Surfaces Drawings The Runway Departure Surfaces Drawing will depict the plan and profile views of the departure surfaces for each runway end that is designated primarily for instrument departures. Currently only Runways 5/23 are equipped with instrument capabilities. However, if it is recommended as part of this master plan that Runways 10/28 also be equipped with some type of instrument approach and departure surface, this will be Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-22 incorporated in the drawing set. The drawings will detail objects that penetrate departure surfaces or violate obstacle clearance criteria. Obstructions will be listed numerically in an obstruction table for each departure surface with data describing the obstruction type, top elevation, allowable elevation, amount of penetration, and proposed dispositions. Plan views will be superimposed on aerial photos for base maps. Airport Airspace Drawings Per FDOT ALP Preparation and Submittal Guidelines, January 18, 2005, it is recommended for clarity to separate the state and federal standards to create a more useful ALP. Thus, two airport airspace drawing sheet(s) will be developed: one illustrating all 14 CFR Part 77 surfaces and one for all FDOT surfaces. The Airport Airspace Drawings will depict all obstacle clearance surfaces associated with the ultimate airport configuration, and approaches will be generated and superimposed on mapping. Fifty (50) foot contour intervals will be shown for all sloping imaginary surfaces. These sheets will depict objects that violate the obstacle clearance surfaces that have not been identified on the ALP or approach sheets. The top elevation of each obstruction will be identified on each sheet as will the disposition of the obstruction. The dimensions of the approach surfaces and transitional surfaces will be charted. The Airport Airspace drawings will depict, in plan and profile view, the full length of all approach surfaces including runway protection zones without the use of match lines or truncated depictions. On and Off Airport Land Use Plan Again, per FDOT ALP requirements, the Airport's existing land use plan will be updated to provide details associated with current and future property use within and surrounding the airport boundaries. The purpose of this sheet is to assist communities to insure that growth around the airport will be compatible use and not impede future aeronautical expansion. Included in the drawing will be the identification of existing and future aviation related (including runway protection zone (RPZ), non -aviation related, environmental, industrial, commercial, or other uses as required. Information developed as part of Tasks 2, 4, 5, and 6 will be incorporated into this drawing. This sheet will also depict recommended development including recommended land acquisition generated as part of Tasks 5 and 6 to help to guide the long-term development of the airport. Exhibit 'A' Airport Property Map An airport property map(s) will be prepared in accordance with AC 150/5100-17, Land Acquisition and Relocation Assistance for Airport Improvement Program Assisted Projects, to allow incorporation of the data acquired as part of the Exhibit'A' Ownership and Encumbrance Property search. The airport property map(s) will depict the various tracts of land that were acquired to develop the airport, and the method of acquisition including any associated obligations stemming from Federal grant or FAA -administered land transfer program. The airport property drawing and data sheet will also reflect parcels acquired either through fee simple purchase, or easements purchased by the airport with both federal and state funds, as well as, with local sources of funding beginning from the original property transfer to the County for the airport. In addition, the property map will also identify additional property required to meet the demands identified in this master plan. Data used to develop the Exhibit'A' Map and data tables will be obtained from the Ownership and Encumbrance report which identified existing and future property needs as well as any additional data provided by the airport, City of Sebastian Community Development and Public Works departments, Indian River County Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-23 Assessor's and Planning and Zoning departments. This sheet(s) will conform to ARP Standard Operating Procedures (SOP) 3.00 Exhibit "A" requirements. Draft Deliverables • Draft Chapter Seven, Airport Layout Plan, narrative report • Thirteen (13) sets of draft ALP for review and distribution as follows: • Deliverable 1 (initial submittal): One (1) set Sponsor, One (1) set FDOT, and Two (2) sets FAA • Deliverable 2 (updated submittal): One (1) set FDOT, Two (2) sets FAA ADO, and six (6) sets for FAA Regional Offices for circulation and review Task 7.2 - Development of Final Airport Layout Plans Set TKDA will revise the ALP drawing set and narrative report to reflect final review comments received by the City, FAA and FDOT, as appropriate. • Final Chapter Seven, Airport Layout Plan narrative report. • Seven (7) full-size, to scale sets and three (3) 11 x 17 inch set of final ALP (Client and Agency changes incorporated) for FAA conditional approval and distribution, as follows: • Two (2) full-size, to scale, signed sets of the final ALP for FAA and one 11 x 17 inch reduced, signed set • Two (2) full-size to scale, signed sets of the final ALP for FDOT and one 11 x 17 inch reduced, signed set • Two (2) full-size to scale, signed sets of the final ALP for the Sponsor and one 11 x 17 inch reduced, signed set • One (1) full-size, to scale, signed set of the final ALP for Consultant • In addition, PDF copies will be provided to FAA, FDOT and the Sponsor. ELEMENT 8 — IMPLEMENTATION PLAN Task 8.1 — Facilities Implementation Plan The facilities implementation plan will provide a proposed schedule and timing for key projects along with project descriptions, estimated development costs and special project considerations. This data will be used to formulate the updated airport capital improvement program. Refine Airport Development Phasing Schedule An initial development schedule will be prepared based upon the demand requirements. A priority system will be developed and adopted for use in this study considering the urgency of need, triggering events, ease of implementation, logic of sequence including linking compatible projects together, and economic viability considering previous federal and state funding on similar projects as well as local funding strategies. The objective is to establish an efficient order for project development and implementation. Recommended airport development over the 20 - year planning period will be classified in three general development phases. These phases represent the short, intermediate, and long-term planning periods. Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-24 Particular focus will be given to detailing estimated costs for short-term (2017-2021) and intermediate-term (2022-2026) development projects. Development costs will be shown on a year-to-year basis and prepared at a level of detail consistent with master planning in order to develop a 20 -Year Capital Improvement Program (CIP). Projects relating to capacity enhancement will be highlighted in the phased development plan. Development phasing will provide a general understanding of the financial requirements by phase over the 20 -year planning period. However, by linking development projects to future demand levels, an added degree of implementation flexibility will be achieved. Refine Airport Development Cost Estimates Based upon the selected alternatives, cost estimates will be created for each of the airport development projects. Cost estimates will be based on a variety of sources, including actual project estimates, published engineering indices, government agencies, and similar airport construction projects in the area. In addition to the actual construction costs, financial consideration must be given to the engineering and design work, plus minor construction items and contingencies, which have not been specifically enumerated. For planning purposes, the base construction cost has been increased to reflect the anticipated engineering, testing, survey, and inspection costs, as well as for unknown contingencies. Project phasing and associated cost estimates will be provided in the current CIP format, which includes a description and cost estimate for each project within the CIP of airport development. Task 8.2 — Financial Feasibility Analysis One of the major indicators of success of any master plan is its ability to be implemented from a financial perspective. Financial considerations of the Master Plan development program will be analyzed, and a realistic financial plan will be developed based upon historic and current funding precedents and local funding strategies. The financial plan will address historical revenues and expenses to determine the Airport's ability to support the capital development program as outlined in the Master Plan Update. Projected operating revenue and expenses will be developed according to growth and the realization of additional revenues and expenses as facilities come on- line. The feasibility analysis will assess the financial implications of undertaking the proposed development plans. In this analysis, the Airport's ability to generate future revenues sufficient to cover future expenses of maintenance, operation, administration, and debt service will be assessed. An output of the plan will be an annual cash flow analysis through the years 2016 in addition to short (2017-2021), intermediate (2022-2026) and long-term demand (2027-2037). A failure to adequately cover operating costs and debt service payments will trigger further examination of airport revenues and expenses, or the capital program itself. The process will be repeated until a financially feasible development program is established. Task 8.3 - Prepare and Submit Chapter 8, Airport Implementation Plan, and Appendices Chapter Eight will present the results of the preceding analyses, outlining the overall Airport capital improvement program, and ordering projects numerically based on the Sponsor's order of priority for individual annual planning periods over the first two years. Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-25 Projects for the three to ten year period, and the ten to twenty year horizon, will be consolidated and linked where fiscally feasible. These projects will be prioritized by their importance, as identified in the Master Plan Update, and through the refinement process, and the anticipated sources of funding for the elements of the selected airport master plan concept will be identified. This will include the identification of local, state, and federal funds, as well as potential sources of private investment for airport improvements. General estimates of equipment costs and operation, and maintenance costs associated with the airport, will be factored into the financial program. The ultimate product will be a realistic and financially viable, twenty-year Airport capital improvement program. ELEMENT 9 — PUBLIC INVOLVEMENT AND COORDINATION MEETINGS Task 9.1 -Technical Advisory Committee Meetings Members of the Technical Advisory Committee should include major airport tenants and/or tenant representative, City/County Economic Development, City Planning and Environmental personnel, airport management, FAA and FDOT environmental, planning and program specialists, community business leaders, as well as local community representatives. The committee should be limited to no more than 12 individuals unless a larger group is warranted in order to keep the process moving and on -budget. Meetings with the Technical Advisory Committee will include a brief review of data provided to date as well as obtaining input with regard to next steps (i.e. alternative development options). Comments received prior to these meetings will be implemented into the report and TAC presentation. Any additional comments received during the meeting will be reviewed and incorporated into the final report. Four (4) TAC meetings, including the project kick-off meeting, were budgeted over the course of the study. + The Kick -Off TAC Meeting will introduce participants to the process, explain their role as well as provide data regarding current conditions at the airport, preliminary forecasts of demand as well as planning goals for future development. + The second Technical Advisory Committee workshop will be held approximately two to three weeks following distribution of Chapters 2, Existing Conditions, and 3, Aviation Activity Forecasts and Critical Design Aircraft. The purpose of this meeting is to present anticipated demand, preliminary capacity and facility requirements needed to support planned development as well as to get input from the TAC regarding what they would like to see at X26. The third TAC workshop will occur approximately three to four weeks following the distribution of Chapter 4, Facility Requirements, and preliminary discussion of proposed development. This workshop will occur just prior to the first Public Meeting in order to allow users, neighbors and other interested individuals to provide input. During the workshops, the TKDA team will explain how we will evaluate proposed development and potential impacts. 3 The third TAC workshop will occur approximately three to four weeks following the distribution of Chapters 5, Airport Alternatives, and 6, Refined Alternatives. This meeting will be held in a roundtable/charrette format in order to gain insight and recommendations with regard to the preferred airport development as well Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-26 as potential financial feasibility and implementation. A comparison matrix of proposed options will be provided including rough order of magnitude costs, potential impacts and mitigation options, land use requirements, etc. From this information, recommended development will be determined for the next twenty years at the airport. Task 9.2 — Public and City Commission Workshops The interim submittals under the master plan study will be presented to the general public and City Commission during two (2) separate meetings over the course of the study. i The first meeting will be held following the third planned Technical Advisory Committee (TAC) meeting in order to allow potentially impacted neighbors and the general public and other interested parties to provide input with regard to future airport development. + The second proposed Public Workshop will likely be held in concert with a City Commission meeting, following submittal and approval of Chapters 5 and 6, Alternatives Evaluation and Recommended Development. The team will present the recommended development as well as preliminary Capital Improvement Program to the City Commission members, airport neighbors and the general public. This meeting will be used to obtain comments with regard to proposed development. Advertising for these meetings will be done by the City, and may be accomplished using press releases and direct mailings to interested public groups. Task 9.3 — Client Coordination Meetings Client coordination meetings are planned approximately two weeks following submittal of each chapter of the master plan update in order to obtain comments and input from the Sponsor. Additional coordination meetings will likely be required through the course of this study. Typically, these meetings are during such milestones as the preparation of the aviation activity forecasts, the alternatives analysis/refined alternatives process, and during the preparation of the capital improvement program and financial plan. Coordination meetings will be held via conference call as well as before or after Technical Advisory Committee, Public or City Commission meetings in order to keep the costs to a minimum. Task 9.4 — Regulatory Agency Coordination Meetings In an effort to streamline the review process as illustrated in Exhibit C, the consultant and sponsor representative will have regular conference calls with FAA Airport District Office, FOOT Aviation and other regulatory (i.e. US Fish and Wildlife, Florida Department of Environmental Protection, Florida Department of Natural Resources, St. Johns River Water Management District, and US Corps of Engineers) personnel. These meetings are planned to occur not earlier than two (2) weeks after a meeting date is established, agreed upon, and meeting materials were distributed to all parties. The regulatory coordination meetings will occur following review by the Sponsor but before meetings with the Technical Advisory Committee. Conference calls/meetings will also occur prior to all public and city commission meetings. The purpose of these meetings is to coordinate efforts, obtain critical information and avoid any potential issues that may delay the project Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-27 Deliverables: Deliverables include meeting minutes, public input and regulatory agency comments provided in appendices within the Master Plan narrative report. This information will be incorporated into the final draft master plan report. ELEMENT 10 - DELIVERABLES AND FINAL DOCUMENTATION Task 10.1 - Draft and Final Master Plan Update Report Revisions to Draft Chapters: This task includes revisions to the draft working papers provided in previous tasks to reflect comments received during the coordination and review process. Prepare Draft Master Plan Report: This task includes providing copies of the final draft to the City of Sebastian staff, FDOT and FAA for final review and approval prior to publication of the final report, which will include all appendices. Five (5) copies of the draft Master Plan Update technical report, including color exhibits, and eleven (11) hard copies of the airport layout plan set will be prepared and submitted for review. One (1) final draft will be delivered to the FAA, two (2) to FDOT, and two (2) to the City for a final review. Publish Final Master Plan Report and Final Deliverables: The final Master Plan Update technical report will be published in an electronic format and five (5) hard copies of the narrative report and two hard copies of the ALP set will be provided to the City of Sebastian. Two (2) hard copies and electronic copies of both the Narrative Report and ALP will be provided to the FDOT, and 11 hard copies of the ALP, one GBC bound copy of the narrative report and two PDF copies of both will be provided to the FAA. Reproduction of the document with offset lithographic printing and laser color copy process will be completed as appropriate. Additional deliverables include electronic copies of the title search and encumbered airport property data as well as any data obtained from the wildlife hazard site visit. PHASE 3 — PROJECT CLOSE OUT Task 3.1 — Basic Services Upon project completion and approval, TKDA will prepare FAA Grant Closeout Report and submit to FAA and FDOT for approval. Sebastian Municipal Airport August 2016 Final Master Plan Update Scope of Services A-28 EXHIBIT B Sebastian Municipal Airport TimA Final Enhanced Master Plan Update Fee Estimate ELEMENT Task 0&,W= Eslmated Persm lours VP -Senior VP Engvlees Sr PlanwEm Spetia8sl Re9deeI[ Engineer 11 Planner Speadasl DD Surveying SpeoaSpuWizt Toam Fours ToW Cost PHASEI: PROJECT FORMULATION 1.1 ProW Scone ad Schedule i 121 121S 1.740 1.2P wlc CLP Updates 1 121 1 121S 1.740 1.3 Pmjacl Fundcq Caadnabon 1 121 1215 1.740 1.4 Graf PWAMbCaWn PaCkar 121 1 12 5 1.740 SUBTOTAL PHASE 1 • Project Formulation 48 48 S 6.960 PHASE 2: NA5TE0. PIAN UPDATE Elamem l: PrclatGoalswvdOblecfivas 1. t Esmblah Technkal Adnsa/Ccmm;nde 4 415 580 1.2 EstabSsh Plannmo and SusUaab1t Goats 4 4 S 580 1,3 EstalSh Sustalnab:h, T t4 and lass.cn StTsmpnt 4 4 5 500 SUBTOTALEIEMENT I 12 12 1,740 Elema dL Usting Cmdklons 2.1 Backgrund 2 2 S 250 2.2 InvaVyAipal Physcal Fwude 24 28 S 3.780 23 AispadaWf Trafk ConoWObsbucbons 2 2 S 290 2.4 V&dy Land Usatand Use Cmb& 4 4 S Sea 2.5 ExhbdW AiPWI PvdqWy Omerio and Enctaftance 24 1 24 5 3.460 2.6 Exis*q Utifty ad Drainage IntasbucWre 81 5 1.160 27 Enuiommaal lnm sub ESA 2.8 Sold Wute Ad& 12 5 1,740 2.9W,6A Hazard See Veit 24 5 3.480 2.10 Aipm User lnlervimASUxKtionna'aes 16 3A80 2.11 Prepae and Submt ChapbnOne and Tao 4 4,940 SUBTOTAL ELEMENT 2 16 8 23.220 P24 Element 3: Avia0m AcUvl Forecasts and CdUul Design Aircraft 3.1 Ines of Hzmrical and CunenlAi Wad 6 5 870 321daddratim of Fades a tip AffectingLevels 1 5 145 3.3 SinoScrao Aviation in Faeasls 12 S 1,740 3.4 Exal and Fomust AmaN 4 S 580 3.5 Foreusl Resourt Consumption 6 B S 1,160 36 Prepae and Subldd ChalaThree. Ava6on AcOv4y Fp z 16 20 S 2320 SUBTOTAL ELEMENT 3 47 51 5 6.615 Elamam 4: AirponCa ad ad Faclily Requirmaus 4.1 Aaapaca 6 Arald Capaclly ad Daley 5 5 5 725 42 Kv%$d Facifty Rmwements 16 18 5 2,610 4.4 Detamme Ce lAvabun FamMy Rebuiemenb 19 10 5 2.610 4.5 Decamine Aspat Suppat Facifty Repusertenls 12 12 S 1.740 4.6 G=ad A=3. Cam:Mton ad P&Wg Raduiements 8 8 3 1.160 47 Our' Lad Area aU Oder Rmuyann6s 8 8 5 1.160 4a Refine Sustainabity Gazes 1 1 21 21S 290 4.9 P1eaam ad Submit CkipW For. AkvW Facdtv RegurwnedK 24 4 81 361S 4.080 SUBTOTAL ELEMENT 4 95 8 107 5 14.375 Omani 5: Airpdd AAemavas 5.1 AAfeld Atemauves 24 16 40 S 4.680 52 Gema Av4don Alw%mies 16 12 20 5 3.220 53 SUWal FacJd= 15 4 19 5 2.475 54 Landzide and Land Use Albmases 12 12 24 5 2.640 55 Prearury Demdonlent Costs ifi 12 28 S 3.916 S6 Prepae ad SubrM Chaaa Flue, AipdnAMmaaes 24 8 36 5 4.080 SUBTOTAL ELEMENT 5 1 1071 12 52 175 $ 21.011 Elwem 6: AllemaUves Rermemesn 6.1 ReFned Ahmnatws Analyse ifi 12 28 S 3,220 6.2 Em nunvtal kfim Fon 16 16 S 2321 6.3 lad Use CamgaadSyad Mappnp 16 4; 32 S 3.520 64 Susbuinabidy Imam and Mwdaing Recouvedaons 16 16 5 2.321 6S Re os mended A -Pm Oevemmad and Pselimury Roject Costs ad Phased 16 4 20 5 2.852 fib Prepare and Subml ChaorerSm. Rec nvmnded Devep rd 24 32 5 4.312 SUBTOTAL RIME 1: 6 104 144 $ 18.544 EXHIBIT B 1 Sebastian Municipal Airport TKDA Final Enhanced Master Plan Update Fee Estimate :m \TENT lazeOeiffiplLn �.� Sr R.e9aRred gegaten.M Planner,£. _ Eng'reer 6s: a's1 g -neem Estmated Person lbws GISCADD Surveying planner Spaxwell Specurit Tole Work Hours Toth Coit Element 7: AI wt Layout Plan Drawings 7.1 DomWwt of DraftA'irDen LayoutPlans Set 12 110 180 336 $ 18.576 7.2 Dermlepment of Fsal A'ryM Layout Plans Set I. 2: 24 fib 5 4,556 SUBTOTAL ELEMENTS 144 204 405 S 27.132 Element 8: Implementation Plan 8.1 Project Pleasng awl FacLOesl Iementation Plan 40 16 56 5 7,928 82 Financial FeasibAfty and Cash He.Anas's 40 16 56 5 7,920 8.3 PmPam and SubrrA Chapter 7. Arend Layout Plan Summary. and B. Imelemnualim Plan 24 2 26 5 3,746 SUBTOTAL ELEMENT 9 104 34 1 138 5 19.602 Element 9: Public Involvement art Coordination Meetings 9.1 TeNncal Admery CmmaRe Meetings )4) a 22 66 S 8,030 92 Pudic Inlormationrah, Commascn Mee- (2) 30 22 52 S 6.000 9.3 Client Copahna en Meetam 40 40 5 5.600 94 FAA and FOOT CoortmaOon Meetings 24 24 S 3,480 SUBTOTAL ELEMENT IO 138 44 1821$ 23.310 Element 10: Final Documentation 10.1 Prepare Draft and Final Master Plan Update Rep 40 24 641$ 7.600 SUBTOTAL ELEMENT 11 40 24 64 1 S 7,600 1 PHASE 2- Mester Plan Wort, Hors 827 78 768 372 7.465 SUBTOTAL PHASE 2-MmtwPlan f S 719.]75 S 10,]71 IS 12.6011111 27.9001S S 159,249 PHASE3: PROJECTCLOSEOUT 3.1 FPA GrentChsuwtReport 1 1 161 1 1 1 1 1615 2320 SUBTOTAL PHASE 3-Closemat 1 1 Hit I I 1 1 1513 2.320 PHASE 4: DIRECT EXPENSES inial and Su6satmce 4,000 FitldEaperses 4.U00 Repoduclins and Reprographics 2.000 SUBTOTAL PHASE 4 - Direct Eapensm, 1 f 10.000 PRASE 5: SUBCONSULTANTS Enveprvie�dal Overviw S 15,000.00 Advanta Cpnsubn LLC 5 3.000.00 14k Senh Company-E.hmilA Property Map Re0udenents 5 15.000.00 TKDA Mark-Up 10% 5 3.30D.00 SUBTOTAL PHASE S - Subconsulbnts I S 26,300 MASTER PLAN UPDATE S 214,929 ROUNDED S 215.000 -May use local surveyor i14i"di a