Loading...
HomeMy WebLinkAboutCSA-18 SW Management Plan Update - Stonecrop (Complete)air of S HOME Of PEUCAN ISUND CERTIFICATE OF PROJECT COMPLETION Date Accepted: 09/18/2019 Project Name & #: Stonecrop Drainage # At 960 Total Project Expenditures: $ 12,000.00 Project Location: Stonecrop Drainage Basin Contractor(s): MBV Engineering Contract Amount(s): $ 12,000.00 Pursuant to the above captioned contract and in compliance of same, we the undersigned do hereby certify that this project is complete. Issuance of this certificate releases the contractor from any further responsibility as stipulated in the contract as it relates to bond performance, payment of subcontractors, release of liens, maintenance and indemnity. All contractual obligations as to warranty, insurance, indemnification and patents, shall remain in full effect for the contractually stipulated period of time. In no way does the issuing of this certificate release the Contractor from all legal obligations as stipulated in Chapter 713 of the Florida Statutes. Therefore, having reviewed the contract and inspected the work, the undersigned to hereby accept the segment as being complete. Project Manfiger / Da Building Official (K applicable) Date (I eAyt tie Cc�t��aww /3/zozo Cjq Clerk Date PROJECTID A1960 Stonecrop Drainage Revenue $ 12,000.00 363010-381130 A1960 (Interfund Transfer from DST) Expenses $ 12,000.00 363151-606920 A1960 (Drainage) 10 27=0 FY19 DATE CHECK# PO# DESCRIPTION VENDOR AMOUNT TOTALS 03/19/19 98970 8699 Stormwater Mgmt Plan Update (Task 1)-thru 03/01/19 MBV Engineering 1,625.00 1,625.00 04/17/19 99088 8699 Stormwater Mgmt Plan Update (Task 1) -thru 03/29119 MBV Engineering 4,225.00 4,225.00 04/17/19 99088 8699 Stormwater Mgmt Plan Update (Task 2)- thru 03/29/19 MBV Engineering 500.00 500.00 04/17/19 99088 8699 Stormwater Mgmt Plan Update (Task 3)- thru 03/29/19 MBV Engineering 1,250.00 1,260.00 04/17/19 99088 8699 Stormwater Mgmt Plan Update (Task 4) - Ill 03/29/19 MBV Engineering 1,250.00 1,250.00 07/22/19 99792 8699 Stormwater Mgmt Plan Update (Task 5) - thru 06/28/19 MBV Engineering 500.00 500.00 08/14/19 99792 8699 Stormwater Mgmt Plan Update (Task 1)- thru 07/26/19 MBV Engineering 650.00 650.00 08/14/19 99792 8699 Stormwater Mgmt Plan Update (Task 5) - thru 07/26/19 MBV Engineering 750.00 750.00 09/18/19 99995 8699 Stormwater Mgmt Plan Update (Contingency) -thru 08/30/19 MBV Engineering 1,250.00 1,250.00 0.00 12,000.00 12,000.00 Balance 0.00 CITY OF SEBASTIAN, FLORIDA WORK AUTHORIZATION FORM CONSULTANT SERVICE AGREEMENT (CSA) MBV ENGINEERING, INC. 1835 201h Street Vero Beach, FL 32960 Work Authorization No: CSA-18 (MBV 19.0070) Project Identification: Stormwater Management Plan Update - Stonecrop IT IS AGREED to undertake the following work in accordance with the provisions of the MBV Engineering, Inc. Master Agreement entitled Non -Exclusive Continuing Professional Services Agreement for Engineering Dated July 12, 2017. Description of Assignment: As per our coordination, the City of Sebastian is looking to have the Stormwater Management Plan updated for the Stonecrop basin area in conjunction with the FEMA grant application requirements. Work Scope: Task l: Preparation of an H&H (Hydrology & Hydraulics) study of approximately 120 nodes for the Stonecrop basin, to include: • Assistance with estimating the Finished Floor Elevations within the basin • Pre and Post Developed length of flood duration determination • Estimate of repair / replacement cost for roadways per FDOT Guidelines • Model the following storm events: 0 25 year- 24 hour and 72 hour 0 100 year - I hour, 24 hour, and 72 hour Task 2: Preparation of a response to both the FEMA Environmental & Engineering comments Task 3: Preparation of an aerial map showing all drainage improvement activities, including the beginning/end coordinates in decimal degree format Task 4: Preparation of a ground disturbance map showing the total area of ground disturbance in square feet and vertical depth in feet. Include the coordinates in decimal degree format of the exact location of all areas of ground disturbance and staging areas Task 5: Contingency for additional responses Deliverables: H & H Study, Response to FEMA comments, Aerial Map, and Ground Disturbance Map - Response to FEMA engineering comments to be no later than 30 days upon authorization - Response to FEMA environmental comments to be by 2/22/19. Basis of Compensation/Period of Services: The above referenced Professional Engineering Services for CSA 18 will be performed for a fee not to exceed the below breakdown of fees: Task I: $ 6,500 Task 2: $ 500 Task 3: $ 1,250 Task 4: $ 1,250 Task 5: $ 5 000 Total $14,500 AGREED: ENGINEERING CONSULTANT: ax"��ate: 02/19/2019 Aaron Bowles, P.E. MBV Engineering, Inc. Attest: anette Williams, MMC, City Clerk CITY OF SEB�ASTIIAAN:: ,, Date � l Ce urfisle City Manager Approved as to Form and Content for Reliance by the City of Sebastian Only: Ahmpeb. Stokes,