HomeMy WebLinkAboutWork AuthorizationCITY OF SEBASTIAN, FLORIDA WORK AUTHORIZATION FORM CONSULTANT SERVICE AGREEMENT (CSA) CARTER ASSOCIATES, INC. 1708 2151 Street Vero Beach, FL 32960 Work Authorization No: CSA - #2 Proiect Title: Stonecrop Drainage Improvement Project — Phase 2 IT IS AGREED to undertake the following work in accordance with the provisions of Carter Associates, Inc. Master Agreement entitled Stonecrop Ditch — Phase 2 Construction Administration, Dated June 9, 2022. Description of Assignment: Carter Associates, Inc. scope of work/project will include the following: 1. Administrative Tasks • Review and familiarize with phase 1 permit plans. • Send notification to phase 1 consulting engineer taking over design responsibility of construction plans. • Assemble phase 1 CAD files into working drawings necessary to create 3D surfaces for computation of quantities and x- sections necessary for construction detail. • Modify phase 1 permit plans as necessary to provide sufficient details for construction purposes. • Meet with City staff(s) to review modified construction plans in detail and prepare for bidding services. 2. Bid Document Preparation/Process • Attend meetings with City staff(s) to develop outline for bid documents utilizing City of Sebastian front end documents. • Prepare a bid item list which will include a "quantity takeoff' to be utilized in the contract documents for the purpose of obtaining unit bid prices during bidding. • Coordinate with the CLIENT on bid dates and provide a pdf file of bid documents and plans for web site posting. CLIENT shall be responsible for advertisement for bids. • Attend a pre -bid meeting. • Provide technical assistance to address contractor questions during the bid process and assist with issuance of addendums if required. • Attend bid opening. • Meet with CLIENT to review and evaluate bids and alternate bid items. • Provide a spreadsheet identifying the bid items along with a side -by -side comparison of each bidder and their bid item prices. • Assist CLIENT with contractor selection and recommendation for award of contract. • Prepare final contract construction documents for execution. 3. Site Inspections • Attend pre -construction meeting with the contractor and CLIENT representative(s). • Review contractor's preliminary schedule, monitor on -going construction progress, and coordinate with contractor to _provide scheduled updates for duration of construction. Provide schedule updates to CLIENT. • Respond to _cohtractor Request for Information (RFI's) and provide construction clarifications as needed. • Review contractor's submittals and shop drawings for approval. • Provide silt fence and erosion control device inspection. • Review density tests and geotechnical reports. • Coordinate with contractor for MOT plan during proposed roadway closing(s). • Conduct regular periodic construction observations/inspections to verify that the construction is proceeding in accordance with the plans and specifications. • Consult with CLIENT for any change order requests during construction. • Review Pay Requests from the contractor and submit to the CLIENT following approval. 4. Project Closeout • Conduct final inspection(s) and prepare punch list of work deficiencies. • Review as -built survey (to be provided by contractor) for compliance with approved plans. • Coordinate with contractor to address deficiency punch list items and re -inspect. • Prepare final certifications to governmental permitting agencies. 5. Pricing CITY OF SEBASTIAN, FLORIDA WORK AUTHORIZATION FORM CONSULTANT SERVICE AGREEMENT (CSA) Description Quantity Administrative Tasks Bid Document Preparation/Process Site Inspections Proiect Closeout 6. Deliverables Provided to the City (surveys, lans, etc.) Descript7lon a. Modified Construction Plans for Biddinq/Construction b. Bid Quantities c. Engineer's Certification of Completion Contracted Unit Price Basic of Compensation/Period of Services: The above referenced description for CSA # will be performed for a fee in the amount of <$>. AGREED: VEND R: J'ohn H. Blum, P.E., Principal ` Carter Associates, Inc. Att st: nette Williams, MMC, City Clerk Date: 2, Z CITY,06 SE ASTIAN: /Paul E. Carlisle City Manager Approved as to Form by the City yf SebaO TOTALS $9,560.00 $11,040.00 $18,340.00 $12.150.00 $51,090.00 Quantity As needed i As needed As needed I Date:/2 Content for Reliance Many AnJ6R-Tr., Esy,*Cjty Attorney CARTER ASSOCIATES, INC. CONSULTING ENGINEERS AND LAND SURVEYORS 1708 MI STRI{I I • YI'R0 PEACH. FLORIDA 32960-3472 - 772-562.4191 • 772.562.7180 WAX) 11111N 11 III 1 I I' 1 PRINVIPAI. oAVIU 1 I UL I I111 P.SM . PRINCII'AI Iil-.11R(il A SIMON% I'V PRINCIPAI PAMICK N. WAI I III.It. I' L I'RINCIPAI MARVIN li CARI I R 1'. %I Con,olhud h, the Him DFAN I. 1111.17111. P 1. (lvnullanl it) the 14111 June 9, 2022 Mrs. Lisa Frazier, AICP Community Development Director City of Sebastian 1225 Main Street Sebastian, Florida 32958 RE: Civil Engineering Seivices Agreement Stone Crop Ditch — Phase 2 Construction Administration CAI Pi-oject No. 21-349.1 E Dear Lisa: R0111:R I N 101INSON. 1'.S M (7.INr(1N 1. RANJ S. KI 1 YI IiR N. SPIiNMR. 11.1: 111IN011(I. S'IUBIIS I'.E. We are pleased to present this proposed agreement to provide civil engineering services for the below described tasks for the City of Sebastian — Stone Crop Ditch Phase 2 project. The following describes our proposed scope of work and terms of agreement between Carter Associates, Inc. (CAI) and the City of Sebastian (CLIENT): SECTION 1: SCOPE OF SERVICES The following scope of services is based on a construction duration ending February 2024. Construction beyond this period may require additional fees. TASK I ADMINISTRATIVE TASKS • Review and familiarize with phase 1 permit plans. • Send notification to phase 1 consulting engineer taking over design responsibility of construction plans. • Assemble phase I CAD files into working drawings necessary to create 3D surfaces for computation of quantities and x-sections necessary for construction detail. • Modify phase 1 permit plans as necessary to provide sufficient details for construction purposes. • Meet with City staff(s) to review modified construction plans in detail and prepare for bidding services. Nolumes/Engineoring/JHBIPROPOSAUCityo(Sebastian-StoneCrop-Phase2.doe Page t of 4 Sawa; Ilolidi ©2022 by CAI TASK 2 —BID DOCUMENT PRE PARATION/PROCESS • Attend meetings with City staff(s) to develop outline for bid documents utilizing City of Sebastian front end documents. • Prepare a bid item list which will include a "quantity takeoff' to be utilized in the contract documents for the purpose of obtaining unit bid prices during bidding. o Coordinate with the CLIENT on bid dates and provide a pdf file of bid documents and plans for web site posting. CLIENT shall be responsible for advertisement for bids. • Attend a pre -bid meeting. • Provide technical assistance to address contractor questions during the bid process and assist with issuance of addendums if required. • Attend bid opening. • Meet with CLIENT to review and evaluate bids and alternate bid items. • Provide a spreadsheet identifying the bid items along with a side -by -side comparison of each bidder and their bid item prices. • Assist CLIENT with contractor selection and recommendation for award of contract, • Prepare final contract construction documents for execution. TASK 3 —SITE INSPECTIONS • Attend pre -construction meeting with the contractor and CLIENT representative(s). • Review contractor's preliminary schedule, monitor on -going construction progress, and coordinate with contractor to provide scheduled updates for duration of construction. Provide schedule updates to CLIENT. • Respond to contractor Request for Information (BFI's) and provide construction clarifications as needed. • Review contractor's submittals and shop drawings for approval. • Provide silt fence and erosion control.device inspection. • Review density tests and geoteclnical reports. • Coordinate with contractor for MOT plan during proposed roadway closing(s). • Conduct regular periodic construction observations/inspections to verify that the construction is proceeding in accordance with the plans and specifications. • Consult with CLIENT for any change order requests during construction. • Review Pay Requests from the contractor and submit to the CLIENT following approval. TASK 4 —PROJECT CLOSEOUT • Conduct final inspection(s) and prepare punch list of work deficiencies. • Review as -built survey (to be provided by contractor) for compliance with approved plans. • Coordinate with contractor to address deficiency punch list items and re -inspect. • Prepare final certifications to governmental permitting agencies. Nolumes/Engineering/JHB/PROPOSAUCIIyofSebaslian-SloneCrop-Phase2.doc Page 2 of 4 02022 b CAI _ A Y sieServing Florida Y ����j SiriCe 19l I SECTION 2: ENGINEERING SCOPE ASSUMPTIONS: In developing this Scope of Services, ENGINEER represents to the CLIENT that the following assumptions have been made and that deviation from these assumptions may require additional work and compensation on behalf of CLIENT to the ENGINEER. 1. This proposal specifically excludes all application and/or impact fees, which shall be the responsibility of the CLIENT. 2. It is our understanding that all permitting/jurisdictional approvals have been obtained with phase 1. Therefore, this agreement excludes all engineering services for permitting approvals. Services in this agreement are limited only to construction administration services. 3. Architectural, landscape, electrical, mechanical, and structural services are not included with this fee proposal. 4. Construction stakeout and as-builts are not included with this proposal. SECTION 3: COMPENSATION The proposed scope of services shown below will be invoiced monthly based on work performed to date for each task. Task 1—Administrative Tasks........................................................................................... $9,560.00. Task 2 —Bid Document Preparation/Pu-ocess................................................................ $11,040.00. Task 3 — Site Inspections............................................................ ....................................... $18,340.00. Task 4 — Project Closeout............................................................................... .................. $12,150.00. TOTAL............................551,090.00. If you have any questions regarding our proposed scope of work or terms of agreement, please call me at your convenience. Our receipt of a signed copy of this agreement will serve as our notice to proceed. Sincerely, CARTER ASSOCIATES, INC. �4- hn H. Blum, P.E. Principal Noiumes/EngineednpfJHBIPROPOSAUCItyo[Sebastian-StoneCrop-Phase2.doo 02022 by CAI Agreed to nd Acc �ted: BY. �/ �; Print Name: i Address: City of Sebastian 1225 Main Street Sebastian, FL 32958 Page 3 of A %1 _X1 Se 1 Florida lTl ��� Shlc�ICe 911 CARTER ASSOCIATES, INC. FEBRUARY 2022 RATESCHEDULE Staff Tvne: Hourly Rates, Engineer (Principal) $185.00 Engineer $165.00 Engineer IA $160.00 Engineer 11 $150.00 Engineer III $135.00 Engineer IV $125.00 Engineer V $110.00 Surveyor (Principal) $185.00 Surveyor (Sr. Consultant) $160.00 Surveyor I $160.00 Surveyor II $145.00 Surveyor IIl $125.00 CAD/GIS Tech I $125.00 CAD/GIS Tech 11 $120.00 CAD/GIS Tech III $115.00 CAD/GIS Tech IV $110.00 CAD/GIS Tech V $100.00 Administrative Staff $ 75.00 Expert Witness $350.00 4 Man Survey Crew $200.00 3-Man Survey Crew $175.00 2-Man Survey Crew $150.00 1-Man Survey Crew $120.00 Inspector $ 90.00 It Systems Administrator $100.00 SPECIALIZED EOUIPMENT: Leica HD P40 Scanner $175.00/Hour Aluminum Boat $500.00/Day All -Terrain Vehicle (ATV)/Trailer $250.00/Day $1,000.00/Week REIMBURSABLE EXPENSES: Postage, Express Mail, etc. Cost Blueprints/B lack I ine (24" x 36") $2.00/Each Color Prints (24"x36) $5.00/Each Mileage IRS Standard Rate Mylar $7.00/Each Photocopies: 8.5" x I I" 15¢/Each 8.5" x 14" 25¢/Each 11" x 17" 350/Each Concrete Monuments $20.00/Each Rebar $ 2.50/Each Laths $ 0.75/Each Hubs $ 1.00/Each Sub -Consultants Cost + 10% Note: These hourly billing rates will be negotiated annually Nolumes/Engineering/ MB/PR0P0SAUCityo(Sebastian-SlonaCrop-Phase2.doc Page 4 of 4 }-Al Serving Flolicla ©2022 by cni l� Sinoe 1911 ATTACHMENT 2 Section IV. Budget/Costs ID# 4337-325-R This section, provide details of all the estimated costs of the project As this information is used for the Benefit -Cost Analysis, reasonable cost estimates are essential. Pre -Award Costs, Project Management, and any Contingency (maximum 5%) need to be reported as separate line items. All cost estimates rounded to the nearest dollar. A. Materials: Any Material utilized to complete project (include acquislion of property) Item Unit Qtv Erosion Control 3400 Type I Turbidity Barrier Soil Tracking Prevention Fill Material Landscape Allowance Sod Armorflex Articulating Concrete Block Revetment System Nyloplast Yard Basin Contech Conspan Structure Stormwater Mitered End Sections Road Pvmt Section (Sub -grade, base, asphalt) Sidewalk Fence (Repair) 2 1 1000 1 2000 5383 4 64 2 210 50 1 Cost Per Unit $2.75 $1,000.00 $5,000.00 $18.00 $10,000.00 $3.25 1 $140.00 1 $800.00 $3,000.00 $500.00 $60.00 $23.50 $12,000.00 Cost $9,350.00 $2,000.00 $5,000.00 $18,000.00 $10,000.00 $6,500.00 $753,620.00 $3,200.00 $192,000.00 $1,000.00 $12,600.00 $1,175.00 $12,000.00 Sub -Total $1,026,445.00 B. Labor: Include equipment costs. Please indicate all "soft", In-house('), or In -kind matches -donated Description of Task Phase I ONLY- Sub -total Site Preparation Stormwater Discharge Armorflox Articulating Stormwater Structures Contech Structure Fence (Repair) Non -Phased or Phase 11 - Sub -total C. Fees Paid Include any other costs associated with the project. Description of Task Phase I - Pre -Award with start date of —I Professional Services - Survey / As -built Professional Services - Civil Engineering Professional Services - Environmental Consulting Regulatory Permitting Construction Management D. Phase 1 ONLY- Sub -total Non -Phased or Phase I/ - Sub -total E. Contingency Costs (max 5%) Phase I Contingency Costs (max 51lo) Won -Phased or Phase 11 Total Contingency Costs (maximum 5%) F. 31412021; Reviewed and Approved by PM. Qtv Rate Cost $0.00 970 $100.00 $97,000.00 80 $100.00 $8,000.00 1600 $100.00 $160,000.00 30 $100.00 $3,000.00 670 $100.00 $67,000.00 80 $100.00 $8,000.00 $343,000.00 Sub -Total $343,000.00 Qtv Rate Cost $0.00 100 $125.00 $12,500.00 130 $150.00 $19,500.00 35 $135.00 $4,725.00 1 $3,000.00 $3,000.00 $39, 725.00 1 $48,600.00 $48,600.00 $48,600.00 Sub -Total $88,325.00 Sub -Total Estimated Project Cost 3J. i [C�. UU $1,457,770.00 ,�,U (10 3i11 S1.418,045.00 S-i1.5-1 i CU 0% $1,457,770.00 $42,541.00 Final Estimated Project Costs $1,500,311.00 I Phase I Subtotal Non -Phased or Phase II Subtotal Note: Backup source is required to support costs Comments: IFederal Share Percentage Requesting (per LMS) 31412021; Reviewed and Approved by PM: $39, 725.00 $1,460,586.00 $1,500,311.00 0.000000000%j